Strategic Project Listing

Showing 435 of 435

Project Phoenix

Project Phoenix

Minimum Local Content:

  • 27% minimum local content for Battery Energy Storage System (BESS)
  • 81% minimum local content for Operations and Maintenance (O&M)

Local Jobs First Additional Requirements:

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.
  • Local content set: October 2026
  • Delivery Agency:
  • Project Type: Other
  • Region: Hume

Camerons Lane Interchange

Camerons Lane Interchange

Minimum Local Content:

  • 96% for the project

Steel Requirement:

90% minimum local content for steel supplied using locally milled and locally fabricated-processed steel, and where possible: o has high recycled content, and/or o is fully recyclable at end-of-life, and/or o delivers a lower embodied carbon solution.

Local Jobs First Additional Requirements:

  • Wherever possible, all consultants, including but not limited to architects, designers, engineers, and other advisers should preference solutions that maximise the use of locally sourced materials, finishes, products, goods, and services in construction, including fittings, fixtures, and equipment. This includes priority consideration of materials and products that may improve resource efficiency, minimise waste, enhance performance and/or overall sustainability outcomes through:
    • recycled content;
    • reduced embodied carbon;
    • adoption of modern methods of construction (MMC) (such as prefabricated, modular and/or offsite manufactured components)
    • bitumen replacement products within bitumen and asphalt.


The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.
  • Local content set: October 2026
  • Delivery Agency:
  • Project Type: Road infrastructure
  • Region: Metropolitan Area

Sunshine Superhub Freight Line Works

Sunshine Superhub Freight Line Works

Minimum Local Content:

  • 93% for the Project
  • 68% for signalling

Steel Requirement:

90% minimum local content for steel supplied using locally milled and locally fabricated-processed steel, and where possible: o has high recycled content, and/or o is fully recyclable at end-of-life, and/or o delivers a lower embodied carbon solution.

Local Jobs First Additional Requirements:

  • Wherever possible, all consultants, including but not limited to architects, designers, engineers, and other advisers must preference solutions that maximise the use of locally sourced materials, finishes, products, goods, and services in construction, including fittings, fixtures, and equipment. This includes priority consideration of materials and products that may improve resource efficiency, minimise waste, enhance performance and/or overall sustainability outcomes through:
    • recycled content;
    • reduced embodied carbon;
    • adoption of modern methods of construction (MMC) (such as prefabricated, modular and/or offsite manufactured components)
    • bitumen replacement products within bitumen and asphalt
  • Prepare a Major Projects Skills Guarantee (MPSG) Workforce Plan including how the bidder will create opportunities for apprentices, trainees and cadets related to signalling and other rail related opportunities.


The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.
  • Local content set: October 2026
  • Delivery Agency:
  • Project Type: Rail infrastructure
  • Region: Metropolitan Area

2026_071 Infrastructure Upgrade Program

2026_071 Infrastructure Upgrade Program

Minimum Local Content:

  • 97% for design and associated pre-construction services

Local Jobs First Additional Requirements:

All bidders, contractors, subcontractors, suppliers and consultants and/or subconsultants, including but not limited to project managers, architects, designers, engineers, and other advisers:

  • must preference solutions that maximise the use of local materials, finishes, products, goods, and services in construction, including fittings, fixtures, and equipment wherever possible. This includes giving priority to materials and products that contain recycled content and demonstrate reduced embodied carbon and improve resource efficiency, minimise waste, and enhance overall sustainability outcomes.
  • are encouraged to use solutions that maximise the use of modern methods of construction such as prefabricated, and/or offsite manufactured components wherever possible, particularly when it offers the opportunity for improved efficiency, reduced waste or savings to the State.

Note that Local Jobs First requirements for the remedial works phase of this Project will be set at a later date.



This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.
  • Local content set: September 2026
  • Delivery Agency:
  • Project Type: Other
  • Region: Metropolitan Area

Kindergarten on School Sites (KOSS) and Kindergarten on Acquired Land (KOAL) programs 2029

Kindergarten on School Sites (KOSS) and Kindergarten on Acquired Land (KOAL) programs 2029

Minimum Local Content:

  • 97% for consulting services
  • 92% for the Project
  • 80% for furniture, fittings and equipment (FF&E)

Steel Requirement:

95% minimum local content for steel supplied using locally milled and locally fabricated-processed steel, and where possible: o has high recycled content, and/or o is fully recyclable at end-of-life, and/or o delivers a lower embodied carbon solution.

Local Jobs First Additional Requirements:

The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.
  • Local content set: October 2026
  • Delivery Agency:
  • Project Type: Building construction
  • Region: Statewide

Donnybrook Road Upgrade

Donnybrook Road Upgrade

Minimum Local Content:

  • 96% for the Project

Steel Requirement:

95% for steel supplied using locally milled and locally fabricated-processed steel, and where possible: o has high recycled content, and/or o is fully recyclable at end-of-life, and/or o delivers a lower embodied carbon solution.

Local Jobs First Additional Requirements:

  • Wherever possible, all consultants, including but not limited to architects, designers, engineers, and other advisers, must preference solutions that maximise the use of locally sourced materials, finishes, products, goods, and services in construction, including fittings, fixtures, and equipment. This includes priority consideration of materials and products that may improve resource efficiency, minimise waste, enhance performance and/or overall sustainability outcomes through:
    • recycled content;
    • reduced embodied carbon;
    • adoption of modern methods of construction (MMC) (such as prefabricated, modular and/or offsite manufactured components);
    • bitumen replacement products within bitumen and asphalt.
  • Bidders, their contractors, subcontractors, suppliers, and designers, including but not limited to engineers, subconsultants and other advisers, must maximise the use of locally manufactured bitumen and asphalt products including the use of recycled content and asphalt replacement products that enhance performance and/or provide sustainability benefits whenever possible.


The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.
  • Local content set: October 2026
  • Delivery Agency:
  • Project Type: Road infrastructure
  • Region: Metropolitan Area

Scope 28 Partnership Contracts

Scope 28 Partnership Contracts

Minimum Local Content:

  • 97% minimum local content for Design and associated pre-construction services
  • 85% minimum local content for Water Treatment Plants
  • 82% minimum local content for Pipes
  • 95% minimum local content for Tanks
  • 96% minimum local content for Dams & Basins
  • 82% minimum local content for Pump station

Steel Requirement:

Maximise the use of steel supplied using locally milled and locally fabricated-processed steel (where steel is required for relevant project works) and where possible: o has high recycled content, and/or o is fully recyclable at end-of-life, and/or o delivers a lower embodied carbon solution.

Local Jobs First Additional Requirements:

Wherever possible, all consultants, including but not limited to architects, designers, engineers, and other advisers must preference solutions that maximise the use of locally sourced materials, finishes, products, goods, and services in construction, including fittings, fixtures, and equipment. This includes priority consideration of materials and products that may improve resource efficiency, minimise waste, enhance performance and/or overall sustainability outcomes through:

  • recycled content;
  • reduced embodied carbon;
  • adoption of modern methods of construction (MMC) (such as prefabricated, modular and/or offsite manufactured components)
  • bitumen replacement products within bitumen and asphalt.


The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.
  • Local content set: October 2026
  • Delivery Agency:
  • Project Type: Utilities
  • Region: Barwon South West

Next Generation New Schools 2030-31 Public Private Partnership (PPP)

Next Generation New Schools 2030-31 Public Private Partnership (PPP)

Minimum Local Content:

  • 97% minimum local content for design and associated pre-construction services
  • 91% minimum local content for the Project
  • 81% minimum local content for furniture, fittings and equipment (FF&E)
  • 80% minimum local content for operations and maintenance
  • 95% minimum local content for steel supplied using locally milled and locally fabricated-processed steel, and where possible: o has high recycled content, and/or o is fully recyclable at end-of-life, and/or o delivers a lower embodied carbon solution

Local Jobs First Additional Requirements:

  • All bidders, contractors, subcontractors, suppliers and consultants and/or subconsultants, including but not limited to project managers, architects, designers, engineers, certifiers and other advisers:
    • must preference solutions that maximise the use of local materials, finishes, products, goods, and services in construction, including fittings, fixtures, and equipment wherever possible. This includes giving priority to materials and products that contain recycled content and demonstrate reduced embodied carbon and improve resource efficiency, minimise waste, and enhance overall sustainability outcomes
    • are encouraged to use solutions that maximise the use of modern methods of construction such as prefabricated, and/or offsite manufactured components wherever possible, particularly when it offers the opportunity for improved efficiency, reduced waste or savings to the State
    • must adopt best practice Design for Manufacture and Assembly (DfMA) methodologies including but not limited to digital tools such as Building Information Modelling (BIM) and continuous engagement
  • Maximise the use of modern methods of construction (MMC) in the design and construction of the Project
  • Local Jobs First completion reporting must be submitted at construction practical completion and project completion.


The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.
  • Local content set: October 2026
  • Delivery Agency:
  • Project Type: Building construction
  • Region: Statewide

Western Treatment Plant Grit & Screenings Plant

Western Treatment Plant Grit & Screenings Plant

Minimum Local Content:

  • 80% for the project

Steel Requirement:

90% minimum local content for steel supplied using locally milled and locally fabricated-processed steel, and where possible use locally milled steel that has high recycled content, is fully recyclable at end-of-life and delivers a lower embodied carbon solution.

Local Jobs First Additional Requirements:

  • Wherever possible, all consultants, including but not limited to architects, designers, engineers, and other advisers:
    • must preference solutions that maximise the use of locally sourced materials, finishes, products, goods, and services in construction, including fittings, fixtures, and equipment
    • this includes priority consideration of materials and products that may improve resource efficiency, minimise waste, enhance performance and/or overall sustainability outcomes through:
      1. i.      recycled content
      2. ii.      reduced embodied carbon
      3. iii.      adoption of modern methods of construction (MMC) (such as prefabricated, modular and/or offsite manufactured components)
      4. iv.      bitumen replacement products within bitumen and asphalt.


The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.
  • Local content set: July 2026
  • Delivery Agency:
  • Project Type: Utilities
  • Region: Metropolitan Area

2029 Early Learning Victoria Centres (ELVCs)

2029 Early Learning Victoria Centres (ELVCs)

Minimum Local Content:

  • 92% for the Project
  • 97% for Design and Preconstruction Services
  • 80% for Furniture, Fittings & Equipment

Steel Requirement:

95% minimum local content for steel supplied using locally milled and locally fabricated-processed steel, and where possible: o has high recycled content, and/or o is fully recyclable at end-of-life, and/or o delivers a lower embodied carbon solution.

Local Jobs First Additional Requirements:

  • All bidders, contractors, subcontractors, suppliers and consultants and/or subconsultants, including but not limited to project managers, architects, designers, engineers, and other advisers:
  • must preference solutions that maximise the use of local materials, finishes, products, goods, and services in construction, including fittings, fixtures, and equipment wherever possible. This includes giving priority to materials and products that contain recycled content and demonstrate reduced embodied carbon and improve resource efficiency, minimise waste, and enhance overall sustainability outcomes
  • are encouraged to use solutions that maximise the use of modern methods of construction such as prefabricated, and/or offsite manufactured components wherever possible, particularly when it offers the opportunity for improved efficiency, reduced waste or savings to the State.


The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.
  • Local content set: September 2026
  • Delivery Agency:
  • Project Type: Building construction
  • Region: Statewide

Towers Redevelopment Tranche 1: North Melbourne

Towers Redevelopment Tranche 1: North Melbourne

Minimum Local Content:

  • 90% minimum local content for construction
  • 80% minimum local content for furniture, fittings and equipment (FF&E)
  • 80% minimum local content for operations and maintenance

Steel Requirement:

• Maximise the use of steel supplied using locally milled and locally fabricated / processed steel, and where possible: o has high recycled content, o is fully recyclable at end-of-life, and/or o delivers a lower embodied carbon solution

Local Jobs First Additional Requirements:

  • Maximise the use of off-site, prefabrication and other modern methods of construction (MMC) wherever possible
  • Homes Victoria, in conjunction with DJSIR and the preferred strategic partner, to hold a roundtable with industry on the project to identify opportunities to optimise the use of suppliers using off-site, prefabrication and other modern methods of construction.


The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.
  • Local content set: August 2026
  • Delivery Agency:
  • Project Type: Building construction
  • Region: Metropolitan Area

Towers Redevelopment Tranche 1: South Melbourne

Towers Redevelopment Tranche 1: South Melbourne

Minimum Local Content:

  • 90% for construction
  • 80% for furniture, fittings and equipment (FF&E)

Steel Requirement:

• Maximise the use of steel supplied using locally milled and locally fabricated / processed steel, and where possible: o has high recycled content, and/or o is fully recyclable at end-of-life, and/or o delivers a lower embodied carbon solution

Local Jobs First Additional Requirements:

  • Maximise the use of off-site, prefabrication and other modern methods of construction (MMC) wherever possible
  • Homes Victoria, in conjunction with DJSIR and the preferred strategic partner, to hold a roundtable with industry on the project to identify opportunities to optimise the use of suppliers using off-site, prefabrication and other modern methods of construction.


The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.
  • Local content set: August 2026
  • Delivery Agency:
  • Project Type: Building construction
  • Region: Metropolitan Area

Sale College

Sale College

Minimum Local Content:

  • 97% for services
  • 90% for construction
  • 82% for furniture, fittings and equipment (FF&E)

Steel Requirement:

90% minimum local content for steel supplied using locally milled and locally processed / fabricated steel, and where possible: o has high recyclable at end-of-life, and/or o is fully recyclable at end-of-life, and/or o delivers a lower embodied carbon solution.

Local Jobs First Additional Requirements:

All bidders, contractors, subcontractors, suppliers and consultants and/or subconsultants, including but not limited to project managers, architects, designers, engineers, and other advisers:

  • must preference solutions that maximise the use of local materials, finishes, products, goods, and services in construction, including fittings, fixtures, and equipment wherever possible. This includes giving priority to materials and products that contain recycled content and demonstrate reduced embodied carbon and improve resource efficiency, minimise waste, and enhance overall sustainability outcomes.
  • are encouraged to use solutions that maximise the use of modern methods of construction such as prefabricated, and/or offsite manufactured components wherever possible, particularly when it offers the opportunity for improved efficiency, reduced waste or savings to the State.


The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.
  • Local content set: August 2026
  • Delivery Agency:
  • Project Type: Building construction
  • Region: Gippsland

New Schools 2029-30 Programme

New Schools 2029-30 Programme

Minimum Local Content:

  • 97% for design and associated pre-construction services

Local Jobs First Additional Requirements:

  • All bidders, contractors, subcontractors, suppliers and consultants and/or subconsultants, including but not limited to project managers, architects, designers, engineers, and other advisers:
    • must preference solutions that maximise the use of local materials, finishes, products, goods, and services in construction, including fittings, fixtures, and equipment wherever possible. This includes giving priority to materials and products that contain recycled content and demonstrate reduced embodied carbon and improve resource efficiency, minimise waste, and enhance overall sustainability outcomes.
    • are encouraged to use solutions that maximise the use of modern methods of construction such as prefabricated, and/or offsite manufactured components wherever possible, particularly when it offers the opportunity for improved efficiency, reduced waste or savings to the State.


The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.
  • Local content set: August 2026
  • Delivery Agency:
  • Project Type: Building construction
  • Region: Statewide

Princes Freeway and Werribee Main Road Interchange Upgrade

Princes Freeway and Werribee Main Road Interchange Upgrade

Minimum Local Content:

  • 96% minimum local content for the project

Steel Requirement:

90% minimum local content for steel supplied using locally milled and locally fabricated-processed steel, and where possible: o has high recycled content, and/or o is fully recyclable at end-of-life, and/or o delivers a lower embodied carbon solution

Local Jobs First Additional Requirements:

Wherever possible, all consultants, including but not limited to architects, designers, engineers, and other advisers:

  • Should preference solutions that maximise the use of locally sourced materials, finishes, products, goods, and services in construction, including fittings, fixtures, and equipment.
  • This includes priority consideration of materials and products that may improve resource efficiency, minimise waste, enhance performance and/or overall sustainability outcomes through:
    • recycled content;
    • reduced embodied carbon;
    • adoption of modern methods of construction (MMC) (such as prefabricated, modular and/or offsite manufactured components)
    • bitumen replacement products within bitumen and asphalt.


The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.
  • Local content set: July 2026
  • Delivery Agency:
  • Project Type: Road infrastructure
  • Region: Metropolitan Area

Mickleham Road Upgrade Stage 2

Mickleham Road Upgrade Stage 2

Minimum Local Content:

  • 96% for the Project

Steel Requirement:

90% minimum local content for steel supplied using locally milled and locally fabricated-processed steel, and where possible: o has high recycled content, and/or o is fully recyclable at end-of-life, and/or o delivers a lower embodied carbon solution.

Local Jobs First Additional Requirements:

Wherever possible, all consultants, including but not limited to architects, designers, engineers, and other advisers:

  • Should preference solutions that maximise the use of locally sourced materials, finishes, products, goods, and services in construction, including fittings, fixtures, and equipment.
  • This includes priority consideration of materials and products that may improve resource efficiency, minimise waste, enhance performance and/or overall sustainability outcomes through:
    • recycled content;
    • reduced embodied carbon;
    • adoption of modern methods of construction (MMC) (such as prefabricated, modular and/or offsite manufactured components)
    • bitumen replacement products within bitumen and asphalt


The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.
  • Local content set: July 2026
  • Delivery Agency:
  • Project Type: Road infrastructure
  • Region: Metropolitan Area

2026-27 Arden Secondary School

2026-27 Arden Secondary School

Minimum Local Content:

  • 97% minimum local content for design and associated pre-construction services

Local Jobs First Additional Requirements:

All bidders, contractors, subcontractors, suppliers and consultants and/or subconsultants, including but not limited to project managers, architects, designers, engineers, and other advisers:

  • must preference solutions that maximise the use of local materials, finishes, products, goods, and services in construction, including fittings, fixtures, and equipment wherever possible. This includes giving priority to materials and products that contain recycled content and demonstrate reduced embodied carbon and improve resource efficiency, minimise waste, and enhance overall sustainability outcomes
  • are encouraged to use solutions that maximise the use of modern methods of construction such as prefabricated, and/or offsite manufactured components wherever possible, particularly when it offers the opportunity for improved efficiency, reduced waste or savings to the State


The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.

Thompsons East KOSS & Proposed P6 (Construction)

Thompsons East KOSS & Proposed P6 (Construction)

Minimum Local Content:

  • 90% for the project
  • 82% for furniture, fittings and equipment (FF&E)

Steel Requirement:

90% for the local content for steel supplied using locally milled and locally fabricated / processed steel

Local Jobs First Additional Requirements:

All bidders, contractors, subcontractors, suppliers and consultants and/or subconsultants, including but not limited to project managers, architects, designers, engineers, and other advisers:

  • must preference solutions that maximise the use of local materials, finishes, products, goods, and services in construction, including fittings, fixtures, and equipment wherever possible.
  • are encouraged to use solutions that maximise the use of modern methods of construction such as prefabricated, and/or offsite manufactured components wherever possible, particularly when it offers the opportunity for improved efficiency, reduced waste or savings to the State.


The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.
Close