Strategic Project Listing

Showing 405 of 405

Disability Inclusion Facilitator Service (DIFS)

Disability Inclusion Facilitator Service (DIFS)

Minimum Local Content:

  • 97% for the project

Local Jobs First Additional Requirements:

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.

Modular Classrooms Program (MCP) Supplier Panel

Modular Classrooms Program (MCP) Supplier Panel

Minimum Local Content:

  • 92% minimum local content for construction
  • 82% minimum local content for Furniture, Fixtures and Equipment (FF&E)

Steel Requirement:

90% minimum local content for steel supplied using locally milled and locally fabricated processed steel.

Local Jobs First Additional Requirements:

  • Participants are required to proactively work with the State's Representative to identify opportunities to invest in productivity-enhancing technology and/or capital equipment for the Project to the satisfaction of the State's Representative. This may, for example, include the identification of investments that could support the procurement, manufacture and delivery of Modular Classrooms as well as build future business productivity, transferable capability (such as housing), and cost reductions.
  • All consultants, including but not limited to architects, designers, engineers, and other advisers, must preference solutions that maximise the use of local materials, finishes, products, goods, and services in construction, including fittings, fixtures, and equipment wherever possible.


The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.

Mt Fraser Water Supply Project

Mt Fraser Water Supply Project

Minimum Local Content:

  • 92% minimum local content for the project

Steel Requirement:

90% minimum local content for steel supplied using locally milled and locally fabricated-processed steel.

Local Jobs First Additional Requirements:

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.
  • Local content set: December 2025
  • Delivery Agency: Yarra Valley Water
  • Project Type: Utilities
  • Region: Metropolitan Area

Kindergartens on School Sites (2028)

Kindergartens on School Sites (2028)

Minimum Local Content:

  • 97% for consulting services
  • 92% for the project
  • 80% for furniture, fittings and equipment (FF&E)

Steel Requirement:

90% for steel supplied using locally milled and locally fabricated / processed steel

Local Jobs First Additional Requirements:

All consultants, including but not limited to architects, designers, engineers, and other advisers, must preference solutions that maximise the use of local materials, finishes, products, goods, and services in construction, including fittings, fixtures, and equipment, and modern methods of construction (such as prefabricated, modular and/or offsite manufactured components) wherever possible



The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.

M4 Water Main Renewal

M4 Water Main Renewal

Minimum Local Content:

  • 69% for Package 1 (Pipelining)
  • 89% for Package 2 (New MSCL pipe)

Local Jobs First Additional Requirements:

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.
  • Local content set: December 2025
  • Delivery Agency: Yarra Valley Water
  • Project Type: Utilities
  • Region: Metropolitan Area

Castlemaine Water Reclamation Plant Upgrade

Castlemaine Water Reclamation Plant Upgrade

Minimum Local Content:

  • 79% for the project
  • 80% for operations and maintenance

Steel Requirement:

Maximise the local content for steel supplied using locally milled and locally fabricated/processed steel

Local Jobs First Additional Requirements:

All consultants, including but not limited to architects, designers, engineers, and other advisers, must preference solutions that maximise the use of local materials, finishes, products, goods, and services in construction, including fittings, fixtures, and equipment, and modern methods of construction (such as prefabricated, modular and/or offsite manufactured components) wherever possible.



The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.
  • Local content set: January 2021
  • Delivery Agency: Coliban Water
  • Project Type: Utilities
  • Region: Grampians

Intelligent Transport Systems (ITS) assets maintenance

Intelligent Transport Systems (ITS) assets maintenance

Minimum Local Content:

  • 81% minimum local content for the Project.

Local Jobs First Additional Requirements:

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.

Eastern Treatment Plant Sludge Dewatering Upgrade

Eastern Treatment Plant Sludge Dewatering Upgrade

Minimum Local Content:

  • 86% minimum local content for the project

Steel Requirement:

Maximise the local content for steel supplied using locally milled and locally fabricated-processed steel

Local Jobs First Additional Requirements:

All consultants, including but not limited to architects, designers, engineers, and other advisers, must preference solutions that maximise the use of local materials, finishes, products, goods, and services in construction, including fittings, fixtures, and equipment, and modern methods of construction (such as prefabricated, modular and/or offsite manufactured components) wherever possible.



This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.
  • Local content set: October 2025
  • Delivery Agency: Melbourne Water
  • Project Type: Utilities
  • Region: Metropolitan Area

Healesville Sewage Treatment Plant Capacity Upgrade

Healesville Sewage Treatment Plant Capacity Upgrade

Minimum Local Content:

  • 80% minimum local content for the project

Steel Requirement:

Maximise the local content for steel supplied using locally milled and locally fabricated-processed steel

Local Jobs First Additional Requirements:

All consultants, including but not limited to architects, designers, engineers, and other advisers, must preference solutions that maximise the use of local materials, finishes, products, goods, and services in construction, including fittings, fixtures, and equipment, and modern methods of construction (such as prefabricated, modular and/or offsite manufactured components) wherever possible.



The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.
  • Local content set: October 2025
  • Delivery Agency: Yarra Valley Water
  • Project Type: Utilities
  • Region: Metropolitan Area

Victorian Road Maintenance Contracts (VRMC) 2026

Victorian Road Maintenance Contracts (VRMC) 2026

Minimum Local Content:

  • 98% for the project

Local Jobs First Additional Requirements:

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.

VicGrid Offshore Wind Transmission Project

VicGrid Offshore Wind Transmission Project

Minimum Local Content:

  • 80% for the Development Phase of the Project consisting of:
  • - 50% for transmission (mechanical & electrical design services) consulting services
  • - 90% for other consulting services (including civil)

Local Jobs First Additional Requirements:

Stage 1 – Development Phase

All consultants, including but not limited to architects, designers, engineers, and other advisers, must preference solutions that maximise the use of local materials, finishes, products, goods, and services in construction, including fittings, fixtures, and equipment, and modern methods of construction (such as prefabricated, modular and/or offsite manufactured components) wherever possible

Bidders must prepare a Market and Workforce Development Plan identifying opportunities for industry development and an approach to further growth of local capabilities.



This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.

2028 Early Learning and Childcare Centres (ELCC) Bundle

2028 Early Learning and Childcare Centres (ELCC) Bundle

Minimum Local Content:

  • 97% for consulting services

Local Jobs First Additional Requirements:

All consultants, including but not limited to architects, designers, engineers, and other advisers, must preference solutions that maximise the use of local materials, finishes, products, goods, and services in construction, including fittings, fixtures, and equipment, and modern methods of construction (such as prefabricated, modular and/or offsite manufactured components) wherever possible



The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.

Regional Housing - Waurn Ponds Station Precinct, Mount Duneed

Regional Housing - Waurn Ponds Station Precinct, Mount Duneed

Minimum Local Content:

  • 97% for consultancy services
  • 95% for early (civil) works

Local Jobs First Additional Requirements:

All consultants, including but not limited to architects, designers, engineers, and other advisers, must preference solutions that maximise the use of local materials, finishes, products, goods, and services in construction, including fittings, fixtures, and equipment, and modern methods of construction (such as prefabricated, modular and/or offsite manufactured components) wherever possible



The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.
  • Local content set: August 2025
  • Delivery Agency: Development Victoria
  • Project Type: Building construction
  • Region: Barwon South West

Melton Line Upgrade

Melton Line Upgrade

Minimum Local Content:

  • 92% for construction

Steel Requirement:

Maximise the local content for steel supplied using locally milled and locally fabricated / processed steel

Local Jobs First Additional Requirements:

All consultants, including but not limited to architects, designers, engineers, and other advisers, must preference solutions that maximise the use of local materials, finishes, products, goods, and services in construction, including fittings, fixtures, and equipment, and modern methods of construction (such as prefabricated, modular and/or offsite manufactured components) wherever possible



The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.

Longwarry Water Recycling Plant Upgrade (Stage 3)

Longwarry Water Recycling Plant Upgrade (Stage 3)

Minimum Local Content:

  • 83% minimum local content for the project

Steel Requirement:

Maximise the local content for steel supplied using locally milled and locally fabricated / processed steel

Local Jobs First Additional Requirements:

All consultants, including but not limited to architects, designers, engineers, and other advisers, must preference solutions that maximise the use of local materials, finishes, products, goods, and services in construction, including fittings, fixtures, and equipment, and modern methods of construction (such as prefabricated, modular and/or offsite manufactured components) wherever possible.



The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.
  • Local content set: August 2025
  • Delivery Agency: South East Water
  • Project Type: Utilities
  • Region: Metropolitan Area

IT Service Contract

IT Service Contract

Minimum Local Content:

  • 97% minimum local content for services

Local Jobs First Additional Requirements:

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.
  • Local content set: August 2025
  • Delivery Agency: Victoria Police
  • Project Type: Services
  • Region: Statewide

Housing Australia Future Fund 2 Metro Project

Housing Australia Future Fund 2 Metro Project

Minimum Local Content:

  • 97% minimum local content for pre-construction services.

Local Jobs First Additional Requirements:

  • All consultants, including but not limited to architects, designers, engineers, and other advisers, must preference solutions that maximise the use of local materials, finishes, products, goods, and services in construction, including fittings, fixtures, and equipment, and modern methods of construction (such as prefabricated, modular and/or offsite manufactured components) wherever possible.
  • Outline the project design team's approach to prioritising the use of locally sourced materials, finishes, products, and services including modern methods of construction (such as prefabricated, modular and/or offsite manufactured components) wherever possible.
  • The successful bidder is expected to engage with the State and ICN Victoria during both the Design Development Stage and Construction Documents stage. Documented evidence must be submitted demonstrating their approach during the monitoring and reporting phase.


The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.
  • Local content set: August 2025
  • Delivery Agency: Homes Victoria
  • Project Type: Building construction
  • Region: Metropolitan Area

Suburban Rail Loop (SRL) East – Work Package E – Stations South

Suburban Rail Loop (SRL) East – Work Package E – Stations South

Minimum Local Content:

  • 90% minimum local content for construction
  • 82% minimum local content for Furniture, Fittings, and Equipment (FF&E)

Steel Requirement:

Maximise the use of steel supplied using locally milled and locally fabricated-processed steel wherever possible

Local Jobs First Additional Requirements:

  • Maximise the use of off-site, prefabrication and other modern methods of construction (MMC) wherever possible.
  • The successful bidder must publish a forward plan of steel procurements on ICN Gateway, updated six-monthly over the life of the project.
  • All consultants, including but not limited to architects, designers, engineers, and other advisers, must preference solutions that maximise the use of local materials, finishes, products, goods, and services in construction, including fittings, fixtures, and equipment, and modern methods of construction (such as prefabricated, modular and/or offsite manufactured components) wherever possible.
  • The successful bidder must provide six-monthly reporting to SRLA and DJSIR on the implementation and progress against the Local Industry Development Plan, including details of the forward plan of steel procurements published for the duration of the project. All other Local Jobs First reporting requirements continue to apply.


The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.