Showing 365 of 365

Project Pegasus

Project Pegasus

Minimum Local Content:

  • 27% for Battery Energy Storage System (BESS)
  • 81% for Operations and Maintenance

Local Jobs First Additional Requirements:

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.

Suburban Rail Loop East - Work Package G - Linewide

Suburban Rail Loop East - Work Package G - Linewide

Minimum Local Content:

  • 50% for Rolling Stock and Signalling
  • 84% for Non-Rolling Stock and Signalling
  • 93% for Operations and Maintenance

Steel Requirement:

100%

Local Jobs First Additional Requirements:

  • The successful bidder must list all steelwork tenders or work packages for the project on ICN Gateway in advance of the market approach.
  • All consultants including but not limited to architects, designers, engineers, and other advisers must preference solutions that maximise local materials, finishes, products, goods, and services in construction including fittings, fixtures and equipment wherever possible.


The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.
  • Local content set: November 2023
  • Delivery Agency: Suburban Rail Loop Authority
  • Project Type: Rail infrastructure
  • Region: Metropolitan Area

Alfred Hospital Infrastructure and Wards Upgrade Project

Alfred Hospital Infrastructure and Wards Upgrade Project

Minimum Local Content:

  • 97% for Consultancy Services
  • 86% for Enabling Works

Local Jobs First Additional Requirements:

All consultants, including but not limited to architects, designers, engineers, and other advisers, must preference solutions that maximise the use of local materials, finishes, products, goods, and services in construction, including fittings, fixtures, and equipment, and modern methods of construction (such as prefabricated, modular and/or offsite manufactured components) wherever possible.

The successful bidder must work with ICN to create a dedicated Local Medtech Industry Sourcing Plan



The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.

Program A - Thompsons Rd-Berwick Cranbourne Intersection Upgrade

Program A - Thompsons Rd-Berwick Cranbourne Intersection Upgrade

Minimum Local Content:

  • 94% for the Project

Steel Requirement:

95% minimum local content for steel supplied using locally milled and locally fabricated-processed steel

Local Jobs First Additional Requirements:

All consultants, including but not limited to architects, designers, engineers, and other advisers, must preference solutions that maximise the use of local materials, finishes, products, goods, and services in construction, including fittings, fixtures, and equipment, and modern methods of construction (such as prefabricated, modular and/or offsite manufactured components) wherever possible.



The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.
  • Local content set: November 2024
  • Delivery Agency: Major Road Projects Victoria
  • Project Type: Road infrastructure
  • Region: Metropolitan Area

Program B - Point Cook Road Intersection Upgrade

Program B - Point Cook Road Intersection Upgrade

Minimum Local Content:

  • 94% for construction

Steel Requirement:

95% minimum local content for steel supplied locally using milled and locally fabricate-processed steel

Local Jobs First Additional Requirements:

All consultants, including but not limited to architects, designers, engineers, and other advisers, must preference solutions that maximise the use of local materials, finishes, products, goods, and services in construction, including fittings, fixtures, and equipment, and modern methods of construction (such as prefabricated, modular and/or offsite manufactured components) wherever possible.



The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.
  • Local content set: November 2024
  • Delivery Agency: Major Road Projects Victoria
  • Project Type: Road infrastructure
  • Region: Metropolitan Area

Ballan Road Intersection Upgrade

Ballan Road Intersection Upgrade

Minimum Local Content:

  • 94% for construction

Steel Requirement:

95% minimum local content for steel supplied using locally milled and locally fabricated-processed steel

Local Jobs First Additional Requirements:

All consultants, including but not limited to architects, designers, engineers, and other advisers, must preference solutions that maximise the use of local materials, finishes, products, goods, and services in construction, including fittings, fixtures, and equipment, and modern methods of construction (such as prefabricated, modular and/or offsite manufactured components) wherever possible.



The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.
  • Local content set: November 2024
  • Delivery Agency: Major Road Projects Victoria
  • Project Type: Road infrastructure
  • Region: Metropolitan Area

Stage 2 Bundle- Mickleham Secondary College & Wollert Secondary College

Stage 2 Bundle- Mickleham Secondary College & Wollert Secondary College

Minimum Local Content:

  • 97% for pre-construction services

Local Jobs First Additional Requirements:

All consultants, including but not limited to architects, designers, engineers, and other advisers, must preference solutions that maximise the use of local materials, finishes, products, goods, and services in construction, including fittings, fixtures, and equipment, and modern methods of construction (such as prefabricated, modular and/or offsite manufactured components) wherever possible.



The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.

Modern Methods of Construction, Regional Victoria

Modern Methods of Construction, Regional Victoria

Minimum Local Content:

  • 92% minimum local content for the project

Steel Requirement:

95% minimum local content for steel supplied using locally milled and locally fabricated-processed steel

Local Jobs First Additional Requirements:

All consultants, including but not limited to architects, designers, engineers, and other advisers, must preference solutions that maximise the use of local materials, finishes, products, goods, and services in construction, including fittings, fixtures, and equipment, and modern methods of construction (such as prefabricated, modular and/or offsite manufactured components) wherever possible.



The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.
  • Local content set: October 2024
  • Delivery Agency: Homes Victoria
  • Project Type: Building construction
  • Region: Statewide

Holden Tank Project

Holden Tank Project

Minimum Local Content:

  • 97% for Consultancy Services

Local Jobs First Additional Requirements:

All consultants, including but not limited to architects, designers, engineers, and other advisers, must preference solutions that maximise the use of local materials, finishes, products, goods, and services in construction, including fittings, fixtures, and equipment, and modern methods of construction (such as prefabricated, modular and/or offsite manufactured components) wherever possible.



The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.
  • Local content set: October 2024
  • Delivery Agency: Greater Western Water
  • Project Type: Utilities
  • Region: Metropolitan Area

Energy Efficiency in Social Housing Program (Phase 2)

Energy Efficiency in Social Housing Program (Phase 2)

Minimum Local Content:

  • 60% minimum local content for the Project

Local Jobs First Additional Requirements:

All consultants, including but not limited to architects, designers, engineers, and other advisers, must preference solutions that maximise the use of local materials, finishes, products, goods, and services in construction, including fittings, fixtures, and equipment, and modern methods of construction (such as prefabricated, modular and/or offsite manufactured components) wherever possible.



This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.
  • Local content set: October 2024
  • Delivery Agency: Homes Victoria
  • Project Type: Other
  • Region: Statewide

Wollahra Secondary College

Wollahra Secondary College

Minimum Local Content:

  • 97% for pre-construction services

Local Jobs First Additional Requirements:

All consultants, including but not limited to architects, designers, engineers, and other advisers, must preference solutions that maximise the use of local materials, finishes, products, goods, and services in construction, including fittings, fixtures, and equipment, and modern methods of construction (such as prefabricated, modular and/or offsite manufactured components) wherever possible.



The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.

Prisoner Transport Services

Prisoner Transport Services

Minimum Local Content:

  • 93% for the project

Local Jobs First Additional Requirements:

Maximise the local content of fit-out and operation of prisoner
transport vehicles



This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.

Suburban Rail Loop (SRL) East – Work Package F – Stations: Glen Waverley to Box Hill

Suburban Rail Loop (SRL) East – Work Package F – Stations: Glen Waverley to Box Hill

Minimum Local Content:

  • 90% for construction
  • 82% for furniture, fittings, and equipment (FF&E)

Steel Requirement:

90% minimum local content for steel supplied using locally milled and locally fabricated-processed steel

Local Jobs First Additional Requirements:

  • The bidder must submit a detailed Plan for Local Industry Sourcing and Engagement (PLISE), which forms an attachment to the Local Industry Development Plan (LIDP) demonstrating in detail how the bidder will deliver on its Local Jobs First Policy commitments and support local industry and jobs growth. The PLISE will focus on long lead items and critical/strategic materials with a particular emphasis on steel, timber and MMC. The PLISE, will include, but is not limited to the following:
    • details of how and when the bidder proposes to communicate with the local market
    • a specific program of engagement with local steel fabricators and MMC sector
    • advanced publication of the procurement schedule for steel, timber, MMC and other long lead items on ICN Gateway, including:
      • project forecast by volume, updated quarterly over the entire project schedule
      • by product (e.g. reinforcement, structural steel, sheet piling, cross-laminated timber or modular/prefabricated elements, etc.)
    • if it is proposed to source internationally, the bidder must retain detailed evidence of commitments to provide the local market with the same access and timelines as the international market
    • details of how the bidder will support capability and capacity growth within the local industry, including MMC and steel, with the bidder to work with Suburban Rail Loop Authority (SRLA) and the Department of Jobs, Skills, Industry and Regions (DJSIR) to identify areas for Victorian industry expansion in order to meet project needs.
  • The successful bidder must provide six-monthly reporting to SRLA and DJSIR on the implementation and progress against the PLISE for the duration of the project. All other Local Jobs First reporting requirements continue to apply.


The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.
  • Local content set: September 2024
  • Delivery Agency: Suburban Rail Loop Authority
  • Project Type: Rail infrastructure
  • Region: Metropolitan Area

Regional Renewable Organics Network

Regional Renewable Organics Network

Minimum Local Content:

  • 53% minimum local content for design and construction

Steel Requirement:

95% minimum local content for steel supplied using locally milled and locally fabricated-processed steel

Local Jobs First Additional Requirements:

All consultants, including but not limited to architects, designers, engineers, and other advisers, must preference solutions that maximise the use of local materials, finishes, products, goods, and services in construction, including fittings, fixtures, and equipment, and modern methods of construction (such as prefabricated, modular and/or offsite manufactured components) wherever possible.



The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.
  • Local content set: September 2024
  • Delivery Agency: Barwon Water
  • Project Type: Utilities
  • Region: Barwon South West

Clearway Towing Services

Clearway Towing Services

Minimum Local Content:

  • 97% minimum local content for the Project

Local Jobs First Additional Requirements:

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.

Provision of Non-Clinical Support Services

Provision of Non-Clinical Support Services

Minimum Local Content:

  • 92% minimum local content for the Project

Local Jobs First Additional Requirements:

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.
  • Local content set: September 2024
  • Delivery Agency: Eastern Health
  • Project Type: Services
  • Region: Metropolitan Area

Aintree North Primary School

Aintree North Primary School

Minimum Local Content:

  • 97% for pre-construction services

Local Jobs First Additional Requirements:

All consultants, including but not limited to architects, designers, engineers, and other advisers, must preference solutions that maximise the use of local materials, finishes, products, goods, and services in construction, including fittings, fixtures, and equipment, and modern methods of construction (such as prefabricated, modular and/or offsite manufactured components) wherever possible.



The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.

Regional Mobile Radio Service Agreement

Regional Mobile Radio Service Agreement

Minimum Local Content:

  • 91%

Local Jobs First Additional Requirements:

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.
Close