Strategic Project Listing

Showing 371 of 371

Early Learning Childcare Centres (ELCCs) 2027

Early Learning Childcare Centres (ELCCs) 2027

Minimum Local Content:

  • 97% for pre-construction services
  • 92% for construction
  • 82% for furniture, fittings and equipment (FF&E)

Steel Requirement:

90% minimum local content for steel supplied using locally milled and locally fabricated-processed steel

Local Jobs First Additional Requirements:

All consultants, including but not limited to architects, designers, engineers, and other advisers, must preference solutions that maximise the use of local materials, finishes, products, goods, and services in construction, including fittings, fixtures, and equipment, and modern methods of construction (such as prefabricated, modular and/or offsite manufactured components) wherever possible.



The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.

Fines and Enforcement Services - Business Processing and Contact Centre Service

Fines and Enforcement Services - Business Processing and Contact Centre Service

Minimum Local Content:

  • 94% for professional services and enabling works

Local Jobs First Additional Requirements:

All consultants, including but not limited to architects, designers, engineers, and other advisers, must preference solutions that maximise the use of local materials, finishes, products, goods, and services in construction, including fittings, fixtures, and equipment, and modern methods of construction (such as prefabricated, modular and/or offsite manufactured components) wherever possible.



This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.

Ballarat Station Upgrade

Ballarat Station Upgrade

Minimum Local Content:

  • 92% for the Project

Steel Requirement:

Maximise the local content for steel supplied using locally milled and locally fabricated-processed steel

Local Jobs First Additional Requirements:

All consultants, including but not limited to architects, designers, engineers, and other advisers, must preference solutions that maximise the use of local materials, finishes, products, goods, and services in construction, including fittings, fixtures, and equipment, and modern methods of construction (such as prefabricated, modular and/or offsite manufactured components) wherever possible.



The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.

New Tarneit West Station

New Tarneit West Station

Minimum Local Content:

  • 92% for the Project

Steel Requirement:

90% minimum local content for steel supplied using locally milled and locally fabricated-processed steel

Local Jobs First Additional Requirements:

All consultants, including but not limited to architects, designers, engineers, and other advisers, must preference solutions that maximise the use of local materials, finishes, products, goods, and services in construction, including fittings, fixtures, and equipment, and modern methods of construction (such as prefabricated, modular and/or offsite manufactured components) wherever possible.



The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.

Regional Housing - Flora Hill, Bendigo Project

Regional Housing - Flora Hill, Bendigo Project

Minimum Local Content:

  • 97% for early works

Local Jobs First Additional Requirements:

All consultants, including but not limited to architects, designers, engineers, and other advisers, must preference solutions that maximise the use of local materials, finishes, products, goods, and services in construction, including fittings, fixtures, and equipment, and modern methods of construction (such as prefabricated, modular and/or offsite manufactured components) wherever possible.



The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.
  • Local content set: December 2024
  • Delivery Agency: Development Victoria
  • Project Type: Building construction
  • Region: Loddon Mallee

Metropolitan Mobile Radio (MMR)

Metropolitan Mobile Radio (MMR)

Minimum Local Content:

  • 76%

Local Jobs First Additional Requirements:

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.

Water and Sewerage Projects (WASP) 2025-28

Water and Sewerage Projects (WASP) 2025-28

Minimum Local Content:

  • 85% for the Project

Local Jobs First Additional Requirements:

All consultants, including but not limited to architects, designers, engineers, and other advisers, must preference solutions that maximise the use of local materials, finishes, products, goods, and services in construction, including fittings, fixtures, and equipment, and modern methods of construction (such as prefabricated, modular and/or offsite manufactured components) wherever possible.



This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.
  • Local content set: December 2024
  • Delivery Agency: Melbourne Water
  • Project Type: Utilities
  • Region: Metropolitan Area

Suburban Rail Loop East - Work Package G - Linewide

Suburban Rail Loop East - Work Package G - Linewide

Minimum Local Content:

  • 50% for Rolling Stock and Signalling
  • 84% for Non-Rolling Stock and Signalling
  • 93% for Operations and Maintenance

Steel Requirement:

100%

Local Jobs First Additional Requirements:

  • The successful bidder must list all steelwork tenders or work packages for the project on ICN Gateway in advance of the market approach.
  • All consultants including but not limited to architects, designers, engineers, and other advisers must preference solutions that maximise local materials, finishes, products, goods, and services in construction including fittings, fixtures and equipment wherever possible.


The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.
  • Local content set: November 2023
  • Delivery Agency: Suburban Rail Loop Authority
  • Project Type: Rail infrastructure
  • Region: Metropolitan Area

Alfred Hospital Infrastructure and Wards Upgrade Project

Alfred Hospital Infrastructure and Wards Upgrade Project

Minimum Local Content:

  • 97% for Consultancy Services
  • 86% for Enabling Works

Local Jobs First Additional Requirements:

All consultants, including but not limited to architects, designers, engineers, and other advisers, must preference solutions that maximise the use of local materials, finishes, products, goods, and services in construction, including fittings, fixtures, and equipment, and modern methods of construction (such as prefabricated, modular and/or offsite manufactured components) wherever possible.

The successful bidder must work with ICN to create a dedicated Local Medtech Industry Sourcing Plan



The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.

Program A - Thompsons Rd-Berwick Cranbourne Intersection Upgrade

Program A - Thompsons Rd-Berwick Cranbourne Intersection Upgrade

Minimum Local Content:

  • 94% for the Project

Steel Requirement:

95% minimum local content for steel supplied using locally milled and locally fabricated-processed steel

Local Jobs First Additional Requirements:

All consultants, including but not limited to architects, designers, engineers, and other advisers, must preference solutions that maximise the use of local materials, finishes, products, goods, and services in construction, including fittings, fixtures, and equipment, and modern methods of construction (such as prefabricated, modular and/or offsite manufactured components) wherever possible.



The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.
  • Local content set: November 2024
  • Delivery Agency: Major Road Projects Victoria
  • Project Type: Road infrastructure
  • Region: Metropolitan Area

Program B - Point Cook Road Intersection Upgrade

Program B - Point Cook Road Intersection Upgrade

Minimum Local Content:

  • 94% for construction

Steel Requirement:

95% minimum local content for steel supplied locally using milled and locally fabricate-processed steel

Local Jobs First Additional Requirements:

All consultants, including but not limited to architects, designers, engineers, and other advisers, must preference solutions that maximise the use of local materials, finishes, products, goods, and services in construction, including fittings, fixtures, and equipment, and modern methods of construction (such as prefabricated, modular and/or offsite manufactured components) wherever possible.



The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.
  • Local content set: November 2024
  • Delivery Agency: Major Road Projects Victoria
  • Project Type: Road infrastructure
  • Region: Metropolitan Area

Ballan Road Intersection Upgrade

Ballan Road Intersection Upgrade

Minimum Local Content:

  • 94% for construction

Steel Requirement:

95% minimum local content for steel supplied using locally milled and locally fabricated-processed steel

Local Jobs First Additional Requirements:

All consultants, including but not limited to architects, designers, engineers, and other advisers, must preference solutions that maximise the use of local materials, finishes, products, goods, and services in construction, including fittings, fixtures, and equipment, and modern methods of construction (such as prefabricated, modular and/or offsite manufactured components) wherever possible.



The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.
  • Local content set: November 2024
  • Delivery Agency: Major Road Projects Victoria
  • Project Type: Road infrastructure
  • Region: Metropolitan Area

Stage 2 Bundle- Mickleham Secondary College & Wollert Secondary College

Stage 2 Bundle- Mickleham Secondary College & Wollert Secondary College

Minimum Local Content:

  • 97% for pre-construction services

Local Jobs First Additional Requirements:

All consultants, including but not limited to architects, designers, engineers, and other advisers, must preference solutions that maximise the use of local materials, finishes, products, goods, and services in construction, including fittings, fixtures, and equipment, and modern methods of construction (such as prefabricated, modular and/or offsite manufactured components) wherever possible.



The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.

Modern Methods of Construction, Regional Victoria

Modern Methods of Construction, Regional Victoria

Minimum Local Content:

  • 92% minimum local content for the project

Steel Requirement:

95% minimum local content for steel supplied using locally milled and locally fabricated-processed steel

Local Jobs First Additional Requirements:

All consultants, including but not limited to architects, designers, engineers, and other advisers, must preference solutions that maximise the use of local materials, finishes, products, goods, and services in construction, including fittings, fixtures, and equipment, and modern methods of construction (such as prefabricated, modular and/or offsite manufactured components) wherever possible.



The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.
  • Local content set: October 2024
  • Delivery Agency: Homes Victoria
  • Project Type: Building construction
  • Region: Statewide

Holden Tank Project

Holden Tank Project

Minimum Local Content:

  • 97% for Consultancy Services

Local Jobs First Additional Requirements:

All consultants, including but not limited to architects, designers, engineers, and other advisers, must preference solutions that maximise the use of local materials, finishes, products, goods, and services in construction, including fittings, fixtures, and equipment, and modern methods of construction (such as prefabricated, modular and/or offsite manufactured components) wherever possible.



The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.
  • Local content set: October 2024
  • Delivery Agency: Greater Western Water
  • Project Type: Utilities
  • Region: Metropolitan Area

Energy Efficiency in Social Housing Program (Phase 2)

Energy Efficiency in Social Housing Program (Phase 2)

Minimum Local Content:

  • 60% minimum local content for the Project

Local Jobs First Additional Requirements:

All consultants, including but not limited to architects, designers, engineers, and other advisers, must preference solutions that maximise the use of local materials, finishes, products, goods, and services in construction, including fittings, fixtures, and equipment, and modern methods of construction (such as prefabricated, modular and/or offsite manufactured components) wherever possible.



This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.
  • Local content set: October 2024
  • Delivery Agency: Homes Victoria
  • Project Type: Other
  • Region: Statewide

Wollahra Secondary College

Wollahra Secondary College

Minimum Local Content:

  • 97% for pre-construction services

Local Jobs First Additional Requirements:

All consultants, including but not limited to architects, designers, engineers, and other advisers, must preference solutions that maximise the use of local materials, finishes, products, goods, and services in construction, including fittings, fixtures, and equipment, and modern methods of construction (such as prefabricated, modular and/or offsite manufactured components) wherever possible.



The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.

Prisoner Transport Services

Prisoner Transport Services

Minimum Local Content:

  • 93% for the project

Local Jobs First Additional Requirements:

Maximise the local content of fit-out and operation of prisoner
transport vehicles



This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.