Strategic Project Listing

Showing 2 of 336

Victorian Renewable Energy Target Auction 2 (VRET2)

Victorian Renewable Energy Target Auction 2 (VRET2)

Minimum Local Content:

  • 67% local content for Solar Projects
  • 65% local content for Wind Projects with towers up to and including diameters of 4.5 metres
  • 61% local content for Wind Projects with towers greater than 4.5 metres in diameter

Local Jobs First Additional Requirements:

Solar Projects:

  • 90% minimum local content for operations and maintenance phase of the projects
  • 95% minimum local content for steel products and components using locally milled steel.

Wind Projects with towers up to and including diameters of 4.5 metres:

  • 90% minimum local content for operations and maintenance phase of the projects
  • 95% minimum local content for steel products and components using locally milled steel.

Wind Projects with towers greater than 4.5 metres in diameter:

  • 90% minimum local content for operations and maintenance phase of the project
  • maximise the use of local steel products using locally milled steel.


The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.

Victorian Renewable Energy Auction (VRET)

Victorian Renewable Energy Auction (VRET)

Minimum Local Content:

  • 64% projects
  • 90% operations phase

Steel Requirement:

90%

Local Jobs First Additional Requirements:

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.
Close

STRATEGIC PROJECTS - LOCAL JOBS FIRST