Strategic Project Listing

Showing 345 of 345

Wooreen Energy Storage Systems

Wooreen Energy Storage Systems

Minimum Local Content:

  • 25 per cent minimum local content for the Project
  • 98 per cent minimum local content for civil works

Steel Requirement:

Maximise the use of locally milled steel

Local Jobs First Additional Requirements:

EnergyAustralia must work with the Department of Jobs, Precincts and Regions and the Industry Capability Network (VIC) Ltd to identify industry development opportunities and support supply chain mapping in the battery storage and related industries.

All consultants including but not limited to designers, engineers and other service providers must preference solutions that maximise the use of local materials, finishes, products, goods and services in construction including fittings, fixtures and equipment wherever possible.



The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.
  • Local content set: September 2022
  • Delivery Agency: EnergyAustralia
  • Project Type: Utilities
  • Region: Gippsland

Werribee Mercy Hospital Emergency Department Expansion

Werribee Mercy Hospital Emergency Department Expansion

Minimum Local Content:

  • 97 per cent minimum local content for consulting services
  • 95 per cent minimum local content for Early Works
  • 90 per cent minimum local content for the project
  • 31 per cent minimum local content for the ICT and Specialist Equipment
  • 80 per cent minimum local content for the Furniture, Fixtures and Equipment (FF&E)

Steel Requirement:

95 per cent minimum local content for steel supplied using locally milled and locally fabricated-processed steel

Local Jobs First Additional Requirements:

All consultants including but not limited to architects, planners, designers, engineers, and other advisors must preference solutions that maximise the use of local materials, finishes, products, goods and services in construction including fittings, fixtures and equipment wherever possible.

Victorian Health Building Authority must advise the Department of Jobs, Precincts and Regions and the Industry Capability Network of any proposed significant diversion from the local content of a steel package or item listed in the successful supplier’s approved Local Industry Development Plan.

The respondent must consult with the Australian MedTech Manufacturing Centre to identify opportunities for local businesses to supply the hospital.

The successful bidder must list all steelwork tenders or work packages for the project on ICN Gateway in advance of the market approach.

The successful bidder must hold a project briefing, including a briefing for steel fabricators on steel packages, involving the ICN prior to works commencing on site or as agreed with the Victorian Health Building Authority (VHBA) and DJSIR.



The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.

Meter Replacements Contract

Meter Replacements Contract

Minimum Local Content:

  • 55 per cent for Mechanical meter installation
  • 62 per cent for Digital meter installation

Local Jobs First Additional Requirements:

Yarra Valley Water must advise the Department of Jobs, Precincts and Regions , and the Industry Capability Network of any proposed significant diversion from local content of any items listed in the successful supplier's approved Local Industry Development Plan.



This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.
  • Local content set: August 2022
  • Delivery Agency: Yarra Valley Water
  • Project Type: Utilities
  • Region: Metropolitan Area

Additional Acute Mental Health Beds in Regional Victoria

Additional Acute Mental Health Beds in Regional Victoria

Minimum Local Content:

  • 97 per cent minimum local content for consulting services
  • 95 per cent minimum local content for Early Works

Local Jobs First Additional Requirements:

All consultants including but not limited to architects, planners, designers, engineers, and other advisors must preference solutions that maximise the use of local materials, finishes, products, goods and services in construction including fittings, fixtures and equipment wherever possible.

The Victorian Health Building Authority must notify the Department of Jobs, Precincts and Regions and the Industry Capability Network of any proposed significant diversion from the  local content including a steel package or any items listed in the successful supplier's approved Local  Industry Development Plan.



The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.

X'trapolis 2.0

X'trapolis 2.0

Minimum Local Content:

  • 60 per cent minimum local content requirement for the project

Local Jobs First Additional Requirements:

Department of Transport must notify the Department of Jobs, Precincts and Regions of any proposed significant diversion from the local content in relation to any items listed in the successful supplier's approved Local Industry Development Plan.



This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.
  • Local content set: August 2022
  • Delivery Agency: Department of Transport
  • Project Type: Manufacturing and services
  • Region: Grampians

Water Treatment Plant 5W Nutrient Removal Plant

Water Treatment Plant 5W Nutrient Removal Plant

Minimum Local Content:

  • 85 per cent for the project

Steel Requirement:

Maximise use of local steel products made from locally milled steel

Local Jobs First Additional Requirements:

Melbourne Water must advise the Department of Jobs, Precincts and Regions and the Industry Capability Network of any proposed significant diversion from the local content of a steel package or item listed in the successful supplier’s approved Local Industry Development Plan.



The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.
  • Local content set: June 2022
  • Delivery Agency: Melbourne Water
  • Project Type: Utilities
  • Region: Metropolitan Area

Rutherglen Residential Aged Care Development Project

Rutherglen Residential Aged Care Development Project

Minimum Local Content:

  • 91 per cent for the Project
  • 99 per cent for the early works
  • 85 per cent for the finishes, fixtures and equipment (FFE)

Local Jobs First Additional Requirements:

All consultants including but not limited to architects, designers, engineers and other advisors must preference solutions that maximise the use of local materials, finishes, products, goods, and services in construction, including FFE wherever possible.

The respondent must consult with the Australian MedTech Manufacturing Centre to identify opportunities for local businesses to supply the aged care facility.

Victorian Health Building Authority must advise the Department of Jobs, Precincts and Regions, and the Industry Capability Network of any proposed significant diversion from the local content of a steel package or item listed in the successful supplier’s approved Local Industry Development Plan.



The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.

New Schools 2024

New Schools 2024

Minimum Local Content:

  • 91 per cent for construction
  • 82 per cent for furniture, fixtures and equipment

Steel Requirement:

Maximise the use of local steel products using locally milled steel

Local Jobs First Additional Requirements:

The Victorian School Building Authority must advise the Department of Jobs, Precincts and Regions and the Industry Capability Network of any proposed significant diversion from the local content of any items listed  in the successful supplier's approved Local Industry Development Plan.



The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.

South Dynon Train Maintenance Facility Upgrade

South Dynon Train Maintenance Facility Upgrade

Minimum Local Content:

  • 92 per cent for the project

Steel Requirement:

Maximise the use of local steel products made from locally milled steel

Local Jobs First Additional Requirements:

Level Crossing Removal Projects must advise the Department of Jobs, Precincts and Regions and the Industry Capability Network of any proposed significant diversion from the local content of a steel package or any item listed in the successful supplier's approved Local Industry Development Plan.



The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.

New Melton Hospital

New Melton Hospital

Minimum Local Content:

  • 97 per cent minimum local content for consulting services and early works
  • 80 per cent minimum local content for operations and maintenance
  • 76 per cent minimum local content for furniture, fixtures and equipment (excluding ICT/AV and specialist equipment
  • 91 per cent minimum local content for design and construction

Steel Requirement:

95 per cent minimum local content for steel supplied using locally milled and locally fabricated-processed steel

Local Jobs First Additional Requirements:

VHBA must advise the Department of Jobs, Precincts and Regions and the Industry Capability Network of any proposed significant diversion from local content in relation to a steel package or any items listed in the supplier's approved Local Industry Development Plan.

The respondent must consult with the Australian MedTech Manufacturing Centre to identify opportunities for local businesses to supply the hospital.

The successful supplier must prepare a steel sourcing strategy, to be updated annually, that identifies the proposed steel sourcing schedule by work package, including product and tonnage to be published on ICN Gateway.

The successful supplier must hold a project briefing involving the ICN prior to works commencing on site or as agreed with the Department of Health and DJSIR.



The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.

Melbourne Airport Rail

Melbourne Airport Rail

Minimum Local Content:

  • 90 per cent for early works

Local Jobs First Additional Requirements:

Rail Projects Victoria must advise the Department of Jobs, Precincts and Regions and the Industry Capability Network of any proposed significant diversion from local content in relation to a steel package or any items listed in the successful supplier's approved Local Industry Development Plan.


The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.
  • Local content set: June 2022
  • Delivery Agency: Rail Projects Victoria
  • Project Type: Rail infrastructure
  • Region: Metropolitan Area

Provision Of Medical Services

Provision Of Medical Services

Minimum Local Content:

  • 100 per cent for the project

Local Jobs First Additional Requirements:

Fire Rescue Victoria must advise the Department of Jobs, Precincts and Regions and the Industry Capabiltiy Network of any proposed significant diversion from local content in of any items listed in the successful supplier's approved Local Industry Development Plan.


This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.
  • Local content set: May 2022
  • Delivery Agency: Fire Rescue Victoria
  • Project Type: Services
  • Region: Statewide

Preferred Pharmaceutical Wholesaler Barwon Health

Preferred Pharmaceutical Wholesaler Barwon Health

Minimum Local Content:

  • 44 per cent for the project

Local Jobs First Additional Requirements:

Barwon Health must advise the Department of Jobs, Precincts and Regions and the Industry Capability Network of any proposed significant diversion from local content of any items in the successful supplier's approved Local Industry Development Plan.


This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.
  • Local content set: May 2022
  • Delivery Agency: Barwon Health
  • Project Type: Other
  • Region: Barwon South West

Preferred Pharmaceutical Wholesaler Eastern Health

Preferred Pharmaceutical Wholesaler Eastern Health

Minimum Local Content:

  • 44 per cent for the project

Local Jobs First Additional Requirements:

Eastern Health must advise the Department of Jobs, Precincts and Regions and the Industry Capability Network of any proposed significant diversion from local content of any items in the successful supplier's approved Local Industry Development Plan.


This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.
  • Local content set: May 2022
  • Delivery Agency: Eastern Health
  • Project Type: Other
  • Region: Metropolitan Area

Werribee Open Range Zoo

Werribee Open Range Zoo

Minimum Local Content:

  • 91 per cent for construction
  • 30 per cent for the Sky Safari Gondola equipment
  • 83 per cent furniture, fixtures and equipment

Local Jobs First Additional Requirements:

All consultants including but not limited to architects, designers, engineers, and other advisers must preference solutions that maximise the use of local materials, finishes, products, goods and services in construction including fittings, fixtures and equipment wherever possible

Development Victoria must advise the Department of Jobs, Precincts and Regions and the Industry Capability Network of any proposed significant diversion from the local content of a steel package or any item listed in the successful supplier’s approved Local Industry Development Plan.



The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.
  • Local content set: May 2022
  • Delivery Agency: Development Victoria
  • Project Type: Building construction
  • Region: Metropolitan Area

Twelve Apostles Main Works

Twelve Apostles Main Works

Minimum Local Content:

  • 90 per cent for construction
  • 97 per cent for pre-construction services
  • 30 per cent for audio visual equipment and installation
  • 80 per cent for furniture, fittings and equipment

Local Jobs First Additional Requirements:

The project design team (including architects, designers, engineers, and other specialists, etc.) must engage with the Industry Capability Network (Industry Advisor) at both the 25 per cent and 80 per cent design development stages to ensure the use of local materials, finishes, products , goods and services, including FFE, is maximised wherever possible.

Development Victoria must advise the Department of Jobs, Precincts and Regions (DJPR), and the Industry Capability Network of any proposed significant diversion from the local content of a steel package or item listed in the successful supplier’s approved Local Industry Development Plan



The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.
  • Local content set: May 2022
  • Delivery Agency: Development Victoria
  • Project Type: Building construction
  • Region: Barwon South West

Victorian Murray Floodplain Restoration Project

Victorian Murray Floodplain Restoration Project

Minimum Local Content:

  • 94 per cent for Package 1
  • 96 per cent for Package 2
  • 96 per cent for Package 3
  • 97 per cent for Package 4
  • 93 per cent for Package 5
  • 96 per cent for Package 6

Local Jobs First Additional Requirements:

Lower Murray Water must advise the Department of Jobs, Precincts and Regions (DJPR), and the Industry Capability Network of any proposed significant diversion from the local content of a steel package or item listed in the successful supplier’s approved Local Industry Development Plan



The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.
  • Local content set: May 2022
  • Delivery Agency: Lower Murray Water
  • Project Type: Other
  • Region: Statewide

Aikenhead Centre for Medical Discovery

Aikenhead Centre for Medical Discovery

Minimum Local Content:

  • 90 per cent for construction works
  • 80 per cent for finishes, fitments, fixtures and equipment

Local Jobs First Additional Requirements:

All consultants including but not limited to architects, designers, engineers and other advisers must preference solutions that maximise the use of local materials, finishes, products, goods and services in construction including fittings, fixtures and equipment wherever possible.

The respondent must consult with the Australian Medtech Manufacturing Centre  to identify opportunities for local businesses to supply the research centre.

St Vincent's Hospital must advise the Department of Jobs, Precincts and Regions and the Industry Capability Network of any proposed significant diversion from the local content of a steel package or item listed in the successful supplier’s approved Local Industry Development Plan.



The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.
  • Local content set: May 2022
  • Delivery Agency: St Vincent's Hospital
  • Project Type: Building construction
  • Region: Metropolitan Area
Close

STRATEGIC PROJECTS - LOCAL JOBS FIRST