Victoria's Adult ED Improvement Program, Austin Hospital

Victoria's Adult ED Improvement Program, Austin Hospital

Minimum Local Content:

  • 97 per cent for the consultancy services and early works
  • 86% for infrastructure plant upgrades and associated early works
  • 92% minimum local content for construction (Main Works)
  • 80% minimum local content for furniture, fittings, and equipment (FF&E) (Main Works)
  • 30% minimum local content for ICT, AV and Specialist Equipment (Main Works)

Steel Requirement:

Maximise local content for steel supplied using locally milled and locally fabricated-processed steel.

Local Jobs First Additional Requirements:

All consultants including but not limited to architects, designers, engineers, and other advisers must preference solutions that maximise the use of local materials, finishes, products, goods, and services in construction including fittings, fixtures and equipment wherever possible.

The supplier must work with the ICN to create a dedicated Local MedTech Industry Sourcing Plan.

Maximise local content for steel supplied using locally milled and locally fabricated-processed steel, as previously set (Main Works).



The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.

Expansion of the Outside School Hours Care (OSHC) Initiative

Expansion of the Outside School Hours Care (OSHC) Initiative

Minimum Local Content:

  • 97 per cent minimum local content for the Project

Local Jobs First Additional Requirements:

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.

Bogong High Plains Road

Bogong High Plains Road

Minimum Local Content:

  • 97 per cent for the Project

Local Jobs First Additional Requirements:

The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.

Metropolitan Victorian Road Maintenance Contract

Metropolitan Victorian Road Maintenance Contract

Minimum Local Content:

  • 98% minimum local content for Western, Eastern, and South-Central Areas

Local Jobs First Additional Requirements:

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.

Gunns Gully Road Interchange

Gunns Gully Road Interchange

Minimum Local Content:

  • 96 per cent minimum local content for the Project

Steel Requirement:

95 per cent minimum local content for the steel supplied using locally milled and locally fabricated-processed steel

Local Jobs First Additional Requirements:

All consultants including but not limited to architects, designers, engineers, and other advisors must preference solutions that maximise the use of local materials, finishes, products, goods, and services in construction including fittings, fixtures, and equipment wherever possible.



The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.

2025 Metropolitan Bus Services Contracts

2025 Metropolitan Bus Services Contracts

Minimum Local Content:

  • 62 per cent minimum local content for the buses
  • 88 per cent minimum local content for the operations and maintenance of fleet/depots
  • 90 per cent minimum local content for the depot works

Local Jobs First Additional Requirements:

Maximise the use of local manufacturers and suppliers for the electrical charging station and ancillaries.

The Local Industry Development Plan must include a strategy that outlines how Respondents will increase skills and workforce development in occupations related to Zero Emission Buses and charging infrastructure. The strategy should be updated annually and must include as a minimum how the Respondent will:

  • increase opportunities for apprentices, trainees, and cadets (ATCs)
  • increase gender diversity in the workforce, including for ATCs, for example in roles related to ZEB and charging infrastructure.



The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.

Radiologist Services

Radiologist Services

Minimum Local Content:

  • 97 per cent minimum local content for the Project

Local Jobs First Additional Requirements:

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.
  • Local content set: June 2023
  • Delivery Agency: Peninsula Health
  • Project Type: Services
  • Region: Metropolitan Area

2025 Early Learning Centres

2025 Early Learning Centres

Minimum Local Content:

  • 97 per cent minimum local content for pre-construction services
  • 92% for the project
  • 82% for furniture, fixtures, and equipment (FF&E)
  • 95% for steel supplied using locally milled and locally fabricated-processed steel

Local Jobs First Additional Requirements:

All consultants including but not limited to architects, designers, engineers, and other advisors must preference solutions that maximise the use of local materials, finishes, products, goods, and services in construction including fittings, fixtures, and equipment wherever possible.



The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.

New West Gippsland Hospital

New West Gippsland Hospital

Minimum Local Content:

  • 97 per cent minimum local content for consulting services
  • 97 per cent minimum local content for early works

Local Jobs First Additional Requirements:

All consultants including but not limited to architects, designers, engineers, and other advisors must preference solutions that maximise the use of local materials, finishes, products, goods, and services in construction including fittings, fixtures, and equipment wherever possible.



The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.

Suburban Rail Loop East - Work Package D - Tunnels Glen Waverley - Box Hill

Suburban Rail Loop East - Work Package D - Tunnels Glen Waverley - Box Hill

Minimum Local Content:

  • 92 per cent minimum local content for the project (excluding Tunnel Boring Machines)

Steel Requirement:

90 per cent minimum local content for steel supplied using locally milled and locally fabricated-processed steel

Local Jobs First Additional Requirements:

All bidders must prepare a steel sourcing plan, to be updated annually by the successful bidder, that identifies the proposed steel sourcing schedule by product and tonnage to be published on ICN Gateway.

The successful bidder must list all steelwork tender packages for the project on ICN Gateway.

All consultants including but not limited to designers, engineers and other advisors must preference solutions that maximise the use of local materials, finishes, products, goods and services in construction including fittings, fixtures, and equipment wherever possible.



The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.

Supply of Digital Meters - South East Water

Supply of Digital Meters - South East Water

Minimum Local Content:

  • 27 per cent minimum local content for the Project

Local Jobs First Additional Requirements:

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.
  • Local content set: May 2023
  • Delivery Agency: South East Water
  • Project Type: Services
  • Region: Metropolitan Area

New Schools 2025

New Schools 2025

Minimum Local Content:

  • 92 per cent for the Project
  • 80 per cent for furniture, fixtures and equipment

Steel Requirement:

90 per cent for steel supplied using locally milled and locally fabricated-processed steel

Local Jobs First Additional Requirements:

The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.

West Wodonga Capacity and Emissions Upgrade

West Wodonga Capacity and Emissions Upgrade

Minimum Local Content:

  • 75 per cent for the Project

Steel Requirement:

Maximise the local content for steel supplied using locally milled and locally fabricated-processed steel

Local Jobs First Additional Requirements:

The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.
  • Local content set: May 2023
  • Delivery Agency: North East Water
  • Project Type: Utilities
  • Region: Hume

Victorian Renewable Energy Terminal

Victorian Renewable Energy Terminal

Minimum Local Content:

  • 97 per cent for the pre-construction phase

Local Jobs First Additional Requirements:

All consultants including but not limited to architects, designers, engineers and other advisers must preference solutions that maximise the use of local materials, finishes, products, goods, and services in construction including fittings, fixtures, and equipment wherever possible.



The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.
  • Local content set: May 2023
  • Delivery Agency: Port of Hastings
  • Project Type: Other
  • Region: Metropolitan Area

DC2 Other Government Land

DC2 Other Government Land

Minimum Local Content:

  • 97 per cent for pre-construction services
  • 97 per cent for early works

Local Jobs First Additional Requirements:

All consultants including but not limited to architects, designers, engineers and other advisers must preference solutions that maximise the use of local materials, finishes, products, goods, and services in construction including fittings, fixtures, and equipment wherever possible.



The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.
  • Local content set: May 2023
  • Delivery Agency: Homes Victoria
  • Project Type: Building construction
  • Region: Metropolitan Area

Digital Meter Procurement

Digital Meter Procurement

Minimum Local Content:

  • 20 per cent for the Project

Local Jobs First Additional Requirements:

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.
  • Local content set: May 2023
  • Delivery Agency: Yarra Valley Water
  • Project Type: Services
  • Region: Metropolitan Area

Hydrogen Park (HyP) Murray Valley

Hydrogen Park (HyP) Murray Valley

Minimum Local Content:

  • 52 per cent minimum local content for the Project excluding the Electrolyser package

Steel Requirement:

Maximise the local content for steel supplied using locally milled and locally fabricated-processed steel

Local Jobs First Additional Requirements:

All consultants including but not limited to architects, designers, engineers and other advisors must preference solutions that maximise the use of local materials, finishes, products, goods and services in construction including fittings, fixtures and equipment, wherever possible.



This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.

Ison Road Overpass

Ison Road Overpass

Minimum Local Content:

  • 96 per cent for the Project

Steel Requirement:

90 per cent minimum local content for steel supplied using locally milled and locally fabricated-processed steel

Local Jobs First Additional Requirements:

The successful bidder must prepare a steel sourcing strategy outlining the steel packages and procurement schedule by product type and tonnage to be published on ICN Gateway within 30 days of contract award.

All consultants including but not limited to architects, designers, engineers, and other advisors must preference solutions that maximise the use of local materials, finishes, products, goods, and services in construction including fittings, fixtures, and equipment wherever possible.



The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.