Strategic Project Listing

Showing 359 of 359

Casey Hospital ED Expansion

Casey Hospital ED Expansion

Minimum Local Content:

  • 97 per cent minimum local content for consulting services

Local Jobs First Additional Requirements:

All consultants including but not limited to architects, designers, engineers and other advisers, must preference solutions that maximise the use of local materials, finishes, products, goods and services in construction including furniture, fittings, and equipment wherever possible.

The supplier must notify the Department of Health, the Industry Capability Network and the Department of Jobs, Precincts and Regions of any proposed significant diversion from the local content of any item listed in their approved Local Industry Development Plan.



The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.

Flemington Racecourse Stabling Upgrade

Flemington Racecourse Stabling Upgrade

Minimum Local Content:

  • 92 per cent minimum local content for construction
  • 68 per cent minimum local content for signalling

Steel Requirement:

90 per cent minimum use of local steel products fabricated or made from locally milled steel

Local Jobs First Additional Requirements:

The supplier must notify the Department of Transport, the Industry Capability Network and the Department of Jobs, Precincts and Regions of any proposed significant diversion from the local content of a steel package, any other item or group of similar items listed in their approved Local Industry Development Plan.



The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.
  • Local content set: October 2022
  • Delivery Agency: Department of Transport
  • Project Type: Rail infrastructure
  • Region: Metropolitan Area

Australian Institute for Infectious Disease

Australian Institute for Infectious Disease

Minimum Local Content:

  • 92% minimum local content for consultants
  • 97% for early works
  • 90% for the project
  • 63% for furniture, fittings, and equipment (FF&E)
  • 30% for specialist equipment

Steel Requirement:

Maximise the use of locally milled and locally fabricated-processed steel

Local Jobs First Additional Requirements:

All consultants including but not limited to architects, designers, engineers and other advisers must preference solutions that maximise the use of local materials, finishes, products, goods and services in construction including fittings, fixtures and equipment wherever possible.

The respondent must consult with the Australian Medtech Manufacturing Centre to identify opportunities for local businesses.



The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.
  • Local content set: August 2023
  • Delivery Agency: University of Melbourne
  • Project Type: Building construction
  • Region: Metropolitan Area

Ground Lease Model (GLM)2 - South Yarra, Prahran, Port Melbourne & Hampton East

Ground Lease Model (GLM)2 - South Yarra, Prahran, Port Melbourne & Hampton East

Minimum Local Content:

  • 91 per cent minimum local content for the project
  • 97 per cent for the demolition
  • 80 per cent for fixtures, fittings and equipment
  • 80 per cent for maintenance

Steel Requirement:

Maximise the use of local steel products using locally milled steel.

Local Jobs First Additional Requirements:

All consultants including but not limited to architects, planners, designers, engineers and other advisors must preference solutions that maximise the use of local materials, finishes, products, goods and services in construction including fittings, fixtures and equipment wherever possible.

Homes Victoria must advise the Department of Jobs, Precincts and Regions and the Industry Capability Network of any proposed significant diversion from the local content of a steel package or any item listed in the successful supplier's approved Local Industry Development Plan.



The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.
  • Local content set: October 2022
  • Delivery Agency: Homes Victoria
  • Project Type: Building construction
  • Region: Metropolitan Area

Monash Roads Upgrade (Clyde Road) Project

Monash Roads Upgrade (Clyde Road) Project

Minimum Local Content:

  • 94 per cent minimum local content for the Project

Steel Requirement:

90 per cent minimum local content for steel supplied using locally milled and locally fabricated-processed steel.

Local Jobs First Additional Requirements:

All consultants including but not limited to architects, designers, engineers and other advisors must preference solutions that maximise the use of local materials, finishes, products, goods and services in construction including fittings, fixtures and equipment wherever possible.

The supplier must notify Major Road Projects Victoria, the Industry Capability Network and the Department of Jobs, Precincts and Regions of any proposed significant diversion from the local content of a steel package, any other item or group of similar items listed in their approved Local Industry Development Plan.



The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.

Monash Health's Preferred Supplier of Medicines and Fluids

Monash Health's Preferred Supplier of Medicines and Fluids

Minimum Local Content:

  • 42 per cent minimum local content for the project

Local Jobs First Additional Requirements:

The supplier must notify Monash Health, the Industry Capability Network and the Department of Jobs, Precincts and Regions of any proposed significant diversion from the local content of any item listed in their approved Local Industry Development Plan.



This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.
  • Local content set: October 2022
  • Delivery Agency: Monash Health
  • Project Type: Other
  • Region: Metropolitan Area

Pakenham Roads Upgrade

Pakenham Roads Upgrade

Minimum Local Content:

  • 96 per cent minimum local content for the project

Local Jobs First Additional Requirements:

All consultants including but not limited to architects, designers, engineers and other advisors must preference solutions that maximise the use of local materials, finishes, products, goods and services in construction including, fittings, fixtures and equipment wherever possible.

The supplier must notify Major Road Projects Victoria, the Industry Capability Network and the Department of Jobs, Precincts and Regions of any proposed significant diversion from the local content of any item listed in their approved Local Industry Development Plan.



The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.

Suburban Rail Loop East - Work Package C

Suburban Rail Loop East - Work Package C

Minimum Local Content:

  • 92 per cent minimum local content for the project (excluding Tunnel Boring Machines)

Steel Requirement:

90 per cent minimum local content for steel products using locally milled steel and locally fabricated-processed steel

Local Jobs First Additional Requirements:

All consultants including but not limited to architects, designers, engineers and other advisers must preference solutions that maximise the use of local materials, finishes, products, goods and, services in construction including fittings, fixtures and equipment wherever possible.

The supplier must notify the Suburban Rail Loop Authority, the Department of Jobs, Precincts and Regions and the Industry Capability Network of any proposed significant diversion from the local content of a steel package or any item listed in their approved Local Industry Development Plan.



The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.

Frankston and Greensborough Multideck Carparks

Frankston and Greensborough Multideck Carparks

Minimum Local Content:

  • 92 per cent minimum local content for the project

Local Jobs First Additional Requirements:

All consultants including but not limited to architects, designers, engineers and other advisors must preference solutions that maximise the use of local materials, finishes, products, goods and services in construction including furniture, fixtures and equipment wherever possible.

The contractor must advise the Level Crossing Removal Project, the Industry Capability Network and the Department of Jobs, Precincts and Regions of any proposed significant diversion from the local content of any items listed in their approved Local Industry Development Plan.



The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.

Melbourne Airport Rail (MAR) - Airport Australian Rail Track Corporation (ARTC) Package (AAP)

Melbourne Airport Rail (MAR) - Airport Australian Rail Track Corporation (ARTC) Package (AAP)

Minimum Local Content:

  • 97 per cent minimum local content for construction
  • 87 per cent minimum local content for signalling

Local Jobs First Additional Requirements:

All consultants including but not limited to architects, planners, designers, engineers and other advisors must preference solutions that maximise the use of local materials, finished, products, goods and services in construction including, fittings, fixtures and equipment wherever possible.

Rail Projects Victoria must advise the Department of Jobs, Precincts and Regions and the Industry Capability Network of any proposed diversion from the local content of a steel package or any item listed in the successful supplier's approved Local Industry Development Plan.



The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.
  • Local content set: September 2022
  • Delivery Agency: Rail Projects Victoria
  • Project Type: Rail infrastructure
  • Region: Metropolitan Area

Mickleham Road Upgrade Stage 1

Mickleham Road Upgrade Stage 1

Minimum Local Content:

  • 97 per cent minimum local content for the project
  • 80 per cent minimum local content for early works (utilities protection and relocation work comprising of communications/electrical/gas/hydraulic cabling, pipework, pits, and enclosures).

Local Jobs First Additional Requirements:

All consultants including but not limited to architects, planners, designers, engineers and other advisers must preference solutions that maximise the use of local materials, finishes, products, goods and services in construction and equipment wherever possible.

Major Road Projects Victoria must advise the Department of Jobs, Precincts and Regions and, the Industry Capability Network of any proposed diversion from the local content of a work package or any item listed in the successful supplier's approved Local Industry Development Plan.



The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.
  • Local content set: September 2022
  • Delivery Agency: Major Road Projects Victoria
  • Project Type: Road infrastructure
  • Region: Metropolitan Area

Melbourne Airport Rail (MAR) - Corridor Package (ACP)

Melbourne Airport Rail (MAR) - Corridor Package (ACP)

Minimum Local Content:

  • 94 per cent minimum local content for construction

Local Jobs First Additional Requirements:

All consultants including but not limited to architects, planners, designers, engineers and other advisors must preference solutions that maximise the use of local materials, finishes, products, goods, and services in construction including fittings, fixtures and equipment wherever possible.

Rail Projects Victoria must advise the Department of Jobs, Precincts and Regions and the Industry Capability Network of any proposed diversion from the local content of a steel package or any item listed in the successful supplier's approved Local Industry Development Plan.



The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.
  • Local content set: September 2022
  • Delivery Agency: Rail Projects Victoria
  • Project Type: Rail infrastructure
  • Region: Metropolitan Area

Water and Sewerage Program 2023

Water and Sewerage Program 2023

Minimum Local Content:

  • 90 per cent minimum local content for the program

Local Jobs First Additional Requirements:

All consultants including but not limited to architects, designers, engineers, and other advisors must preference solutions that maximise the use of local materials, finishes, products, goods, and services in construction including fittings, fixtures, and equipment wherever possible.

Melbourne Water must advise the Department of Jobs, Precincts and Regions, and the Industry Capability Network of any proposed significant diversion from the local content of any items listed in the successful supplier’s approved Local Industry Development Plan.



The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.
  • Local content set: September 2022
  • Delivery Agency: Melbourne Water
  • Project Type: Utilities
  • Region: Metropolitan Area

Future of Public Transport Ticketing

Future of Public Transport Ticketing

Minimum Local Content:

  • 41 per cent minimum local content for the capital phase of the project
  • 80 per cent minimum local content for the operations phase of the project

Local Jobs First Additional Requirements:

Department of Transport must notify the Department of Jobs ,Precincts and Regions and the Industry Capability Network of any proposed significant diversion from the local content in relation to any items listed in the successful supplier's approved Local Industry Development Plan.



This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.
  • Local content set: September 2022
  • Delivery Agency: Department of Transport
  • Project Type: Services
  • Region: Metropolitan Area

Wooreen Energy Storage Systems

Wooreen Energy Storage Systems

Minimum Local Content:

  • 25 per cent minimum local content for the Project
  • 98 per cent minimum local content for civil works

Steel Requirement:

Maximise the use of locally milled steel

Local Jobs First Additional Requirements:

EnergyAustralia must work with the Department of Jobs, Precincts and Regions and the Industry Capability Network (VIC) Ltd to identify industry development opportunities and support supply chain mapping in the battery storage and related industries.

All consultants including but not limited to designers, engineers and other service providers must preference solutions that maximise the use of local materials, finishes, products, goods and services in construction including fittings, fixtures and equipment wherever possible.



The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.
  • Local content set: September 2022
  • Delivery Agency: EnergyAustralia
  • Project Type: Utilities
  • Region: Gippsland

Werribee Mercy Hospital Emergency Department Expansion

Werribee Mercy Hospital Emergency Department Expansion

Minimum Local Content:

  • 97 per cent minimum local content for consulting services
  • 95 per cent minimum local content for Early Works
  • 90 per cent minimum local content for the project
  • 31 per cent minimum local content for the ICT and Specialist Equipment
  • 80 per cent minimum local content for the Furniture, Fixtures and Equipment (FF&E)

Steel Requirement:

95 per cent minimum local content for steel supplied using locally milled and locally fabricated-processed steel

Local Jobs First Additional Requirements:

All consultants including but not limited to architects, planners, designers, engineers, and other advisors must preference solutions that maximise the use of local materials, finishes, products, goods and services in construction including fittings, fixtures and equipment wherever possible.

Victorian Health Building Authority must advise the Department of Jobs, Precincts and Regions and the Industry Capability Network of any proposed significant diversion from the local content of a steel package or item listed in the successful supplier’s approved Local Industry Development Plan.

The respondent must consult with the Australian MedTech Manufacturing Centre to identify opportunities for local businesses to supply the hospital.

The successful bidder must list all steelwork tenders or work packages for the project on ICN Gateway in advance of the market approach.

The successful bidder must hold a project briefing, including a briefing for steel fabricators on steel packages, involving the ICN prior to works commencing on site or as agreed with the Victorian Health Building Authority (VHBA) and DJSIR.



The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.

Meter Replacements Contract

Meter Replacements Contract

Minimum Local Content:

  • 55 per cent for Mechanical meter installation
  • 62 per cent for Digital meter installation

Local Jobs First Additional Requirements:

Yarra Valley Water must advise the Department of Jobs, Precincts and Regions , and the Industry Capability Network of any proposed significant diversion from local content of any items listed in the successful supplier's approved Local Industry Development Plan.



This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.
  • Local content set: August 2022
  • Delivery Agency: Yarra Valley Water
  • Project Type: Utilities
  • Region: Metropolitan Area

Additional Acute Mental Health Beds in Regional Victoria

Additional Acute Mental Health Beds in Regional Victoria

Minimum Local Content:

  • 97 per cent minimum local content for consulting services
  • 95 per cent minimum local content for Early Works

Local Jobs First Additional Requirements:

All consultants including but not limited to architects, planners, designers, engineers, and other advisors must preference solutions that maximise the use of local materials, finishes, products, goods and services in construction including fittings, fixtures and equipment wherever possible.

The Victorian Health Building Authority must notify the Department of Jobs, Precincts and Regions and the Industry Capability Network of any proposed significant diversion from the  local content including a steel package or any items listed in the successful supplier's approved Local  Industry Development Plan.



The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.
Close

STRATEGIC PROJECTS - LOCAL JOBS FIRST