Strategic Project Listing

Showing 363 of 363

Bendigo Water Reclamation Plant Solids Handling Upgrade

Bendigo Water Reclamation Plant Solids Handling Upgrade

Minimum Local Content:

  • 73% minimum local content for the Project

Local Jobs First Additional Requirements:

All consultants including but not limited to architects, planners, designers, engineers, and other advisors must preference solutions that maximise the use of local materials, finishes, products, goods, and services in construction including fittings, fixtures and equipment wherever possible.



The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.
  • Local content set: February 2024
  • Delivery Agency: Coliban Water
  • Project Type: Utilities
  • Region: Loddon Mallee

Monash Health-Casey Hospital (MHCH) Multideck Carpark Project

Monash Health-Casey Hospital (MHCH) Multideck Carpark Project

Minimum Local Content:

  • 97 per cent for consultancy services
  • 94 per cent for construction

Steel Requirement:

95 per cent minimum local content for steel supplied using locally milled and locally fabricated-processed steel.

Local Jobs First Additional Requirements:

All consultants including but not limited to architects, designers, engineers, and other advisers must preference solutions that maximise the use of local materials, finishes, products, goods, and services in construction including fittings, fixtures and equipment wherever possible.



The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.
  • Local content set: February 2024
  • Delivery Agency: Monash Health
  • Project Type: Building construction
  • Region: Metropolitan Area

Royal Melbourne Hospital Materials Building Demolition

Royal Melbourne Hospital Materials Building Demolition

Minimum Local Content:

  • 97% for consultancy services
  • 91% for early works

Local Jobs First Additional Requirements:

All consultants including but not limited to architects, designers, engineers, and other advisers must preference solutions that maximise the use of local materials, finishes, products, goods, and services in construction including fittings, fixtures and equipment wherever possible.



The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.

Towers Redevelopment Tranche 1

Towers Redevelopment Tranche 1

Minimum Local Content:

  • 97% for consulting services
  • 98% for early works

Local Jobs First Additional Requirements:

All consultants including but not limited to architects, designers, engineers, and other advisers must preference solutions that maximise the use of local materials, finishes, products, goods, and services in construction including fittings, fixtures, and equipment wherever possible.



The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.
  • Local content set: December 2023
  • Delivery Agency: Homes Victoria
  • Project Type: Building construction
  • Region: Metropolitan Area

Metropolitan School Cleaning Program

Metropolitan School Cleaning Program

Minimum Local Content:

  • 98 per cent minimum local content for the project

Local Jobs First Additional Requirements:

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.

South Dynon Train Maintenance Facility (Stage 2)

South Dynon Train Maintenance Facility (Stage 2)

Minimum Local Content:

  • 96 per cent minimum local content for the Project

Steel Requirement:

95 per cent minimum local content for steel supplied using locally milled and locally fabricated-processed steel

Local Jobs First Additional Requirements:

The successful bidder must list all steelwork tenders or work packages for the project on ICN Gateway in advance of the market approach



The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.

Free Pads and Tampons in Public Places

Free Pads and Tampons in Public Places

Minimum Local Content:

  • 85 per cent minimum local content for the Project

Local Jobs First Additional Requirements:

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.

Pharmaceutical Wholesaler Service Agreement

Pharmaceutical Wholesaler Service Agreement

Local Jobs First Additional Requirements:

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.

High-Rise Cooling Program

High-Rise Cooling Program

Local Jobs First Additional Requirements:

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.

Provision of Meter Services

Provision of Meter Services

Minimum Local Content:

  • 68 per cent minimum local content for the project

Local Jobs First Additional Requirements:

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.
  • Local content set: November 2023
  • Delivery Agency: Greater Western Water
  • Project Type: Services
  • Region: Metropolitan Area

Emergency Response Vehicle Panel

Emergency Response Vehicle Panel

Minimum Local Content:

  • 40 per cent for Cab Chassis
  • 40 per cent for Turnkey aerial appliances
  • 57 per cent for Turnkey aerial appliances with local body building
  • 63 per cent for Turnkey water and non-water appliances with local body building
  • 75 per cent for Appliances with local body building

Local Jobs First Additional Requirements:

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.
  • Local content set: November 2023
  • Delivery Agency: Fire Rescue Victoria
  • Project Type: Services
  • Region: Statewide

Make-safe Works and Services Agreement 2024-29

Make-safe Works and Services Agreement 2024-29

Minimum Local Content:

  • 98% minimum local content for the Project

Local Jobs First Additional Requirements:

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.

Arden Precinct

Arden Precinct

Minimum Local Content:

  • 97% for consultancing services
  • 96% for early works
  • 92% for construction of enabling infrastructure

Local Jobs First Additional Requirements:

The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.
  • Local content set: October 2023
  • Delivery Agency: Development Victoria
  • Project Type: Building construction
  • Region: Metropolitan Area

Dandenong Hospital

Dandenong Hospital

Minimum Local Content:

  • 97 per cent minimum local content for consultancy services

Local Jobs First Additional Requirements:

All consultants including but not limited to architects, designers, engineers, and other advisers must preference solutions that maximise the use of local materials, finishes, products, goods, and services in construction including fittings, fixtures and equipment wherever possible

The successful supplier must work with the ICN to create a dedicated Local Medtech Industry Sourcing Plan.



The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.

Public Sector Residential Aged Care Services

Public Sector Residential Aged Care Services

Minimum Local Content:

  • 97% for consultancy services

Local Jobs First Additional Requirements:

All consultants including but not limited to architects, designers, engineers, and other advisors must preference solutions that maximise the use of local materials, finishes, products, goods, and services in construction including fittings, fixtures, and equipment wherever possible

The respondent must consult with the Australian Medtech Manufacturing Centre to identify opportunities for local businesses to supply the hospital

Successful supplier must work with the ICN to create a dedicated Local Medtech Industry Sourcing Plan.



The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.

Queen Elizabeth II Hospital

Queen Elizabeth II Hospital

Minimum Local Content:

  • 97% for consultancy services

Local Jobs First Additional Requirements:

All consultants including but not limited to architects, designers, engineers, and other advisers must preference solutions that maximise the use of local materials, finishes, products, goods, and services in construction including fittings, fixtures and equipment wherever possible

The supplier must work with the ICN to create a dedicated Local Medtech Industry Sourcing Plan.



The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.

Monash Medical Centre Tower Expansion

Monash Medical Centre Tower Expansion

Minimum Local Content:

  • 97% for Consultancy Services and Early Works
  • 90% minimum local content for New Build and Refurbishment
  • 83% minimum local content for furniture, fittings, and equipment (FF&E)
  • 30% minimum local content for specialist equipment

Steel Requirement:

90% minimum local content for steel supplied using locally milled and locally fabricated-processed steel

Local Jobs First Additional Requirements:

All consultants including but not limited to architects, designers, engineers, and other advisers must preference solutions that maximise the use of local materials, finishes, products, goods, and services in construction including fittings, fixtures and equipment wherever possible.

The supplier must work with the ICN to create a dedicated Local Medtech Industry Sourcing Plan.



The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.

Northern Hospital Redevelopment

Northern Hospital Redevelopment

Minimum Local Content:

  • 97% for consultancy services (Initial Works)
  • 92% for decanting and early works (Initial Works)
  • 80% for furniture, fittings, and equipment (Initial Works)
  • 30% for audio visual and specialist equipment (Initial Works)
  • 97% minimum local content for demolition (Stage 1 Ambulatory Care Centre (ACC) Building)
  • 90% minimum local content for construction of the ACC building (Stage 1 Ambulatory Care Centre (ACC) Building)

Local Jobs First Additional Requirements:

Maximise steel supplied using locally milled and locally fabricated-processed steel for buildings in the early works phase  (Initial Works)

All consultants including but not limited to architects, designers, engineers, and other advisers must preference solutions that maximise the use of local materials, finishes, products, goods, and services in construction including fittings, fixtures and equipment wherever possible (Initial Works)

Work with ICN to create a dedicated Local Medtech Industry Sourcing Plan  (Initial Works)

Maximise local content for steel supplied using locally milled and locally fabricated-processed steel for buildings in the early works phase, as previously set (Stage 1 Ambulatory Care Centre (ACC) Building).



The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.
Close

STRATEGIC PROJECTS - LOCAL JOBS FIRST