Strategic Project Listing

Showing 418 of 418

Thompsons East KOSS & Proposed P6 (Construction)

Thompsons East KOSS & Proposed P6 (Construction)

Minimum Local Content:

  • 90% for the project
  • 82% for furniture, fittings and equipment (FF&E)

Steel Requirement:

90% for the local content for steel supplied using locally milled and locally fabricated / processed steel

Local Jobs First Additional Requirements:

All bidders, contractors, subcontractors, suppliers and consultants and/or subconsultants, including but not limited to project managers, architects, designers, engineers, and other advisers:

  • must preference solutions that maximise the use of local materials, finishes, products, goods, and services in construction, including fittings, fixtures, and equipment wherever possible.
  • are encouraged to use solutions that maximise the use of modern methods of construction such as prefabricated, and/or offsite manufactured components wherever possible, particularly when it offers the opportunity for improved efficiency, reduced waste or savings to the State.


The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.

Rockbank Toolern Road Proposed P6 & ELV (Construction)

Rockbank Toolern Road Proposed P6 & ELV (Construction)

Minimum Local Content:

  • 92% for the project
  • 80% for furniture, fittings and equipment (FF&E)

Steel Requirement:

90% for the local content for steel supplied using locally milled and locally fabricated / processed steel

Local Jobs First Additional Requirements:

All bidders, contractors, subcontractors, suppliers and consultants (and their subconsultants), including but not limited to project managers, architects, designers, engineers, and other advisers, must preference solutions that maximise the use of local materials, finishes, products, goods, and services in construction, including fittings, fixtures, and equipment whenever possible.

All bidders, contractors, subcontractors, suppliers and, their consultants and/or subconsultants, including but not limited to project managers, architects, designers, engineers, and other advisers, are encouraged to use solutions that maximise the use of modern methods of construction such as prefabricated, and/or offsite manufactured components wherever possible, particularly when it offers the opportunity for improved efficiency, reduced waste or savings to the State.



The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.

Woodstock Primary School

Woodstock Primary School

Minimum Local Content:

  • 97% for services
  • 90% for construction
  • 83% for furniture, fittings and equipment (FF&E)

Steel Requirement:

90% minimum local content for steel supplied using locally milled and locally fabricated-processed steel, and where possible: o has high recycled content, and/or o is fully recyclable at end-of-life, and/or o delivers a lower embodied carbon solution.

Local Jobs First Additional Requirements:

All bidders, contractors, subcontractors, suppliers and consultants and/or subconsultants, including but not limited to project managers, architects, designers, engineers, and other advisers:

  • must preference solutions that maximise the use of local materials, finishes, products, goods, and services in construction, including fittings, fixtures, and equipment wherever possible. This includes giving priority to materials and products that contain recycled content and demonstrate reduced embodied carbon and improve resource efficiency, minimise waste, and enhance overall sustainability outcomes
  • are encouraged to use solutions that maximise the use of modern methods of construction such as prefabricated, and/or offsite manufactured components wherever possible, particularly when it offers the opportunity for improved efficiency, reduced waste or savings to the State.


The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.

Towers Redevelopment Tranche 1: 20 Elgin St & 141 Nicholson St Carlton

Towers Redevelopment Tranche 1: 20 Elgin St & 141 Nicholson St Carlton

Minimum Local Content:

  • 90% minimum local content for the project
  • 80% minimum local content for furniture, fittings and equipment (FF&E)

Steel Requirement:

Maximise the local content for steel supplied using locally milled and locally fabricated / processed steel

Local Jobs First Additional Requirements:

Maximise the use of off-site, prefabrication and other modern methods of construction (MMC) wherever possible.



The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.
  • Local content set: June 2025
  • Delivery Agency: Homes Victoria
  • Project Type: Building construction
  • Region: Metropolitan Area

Albert Park Pit Building

Albert Park Pit Building

Minimum Local Content:

  • 97% for consultancy services
  • 93% for construction
  • 80% for furniture, fittings, and equipment (FF&E)
  • Maximise the use of off-site, prefabrication and other modern methods of construction (MMC) wherever possible.

Steel Requirement:

95% minimum local content for steel supplied using locally milled and locally fabricated-processed steel

Local Jobs First Additional Requirements:

The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.
  • Local content set: September 2024
  • Delivery Agency: Development Victoria
  • Project Type: Building construction
  • Region: Metropolitan Area

2028 Schools Stage 2 Builds Project

2028 Schools Stage 2 Builds Project

Minimum Local Content:

  • 97% for services
  • 91% for construction
  • 82% for furniture, fittings and equipment (FF&E)

Local Jobs First Additional Requirements:

All consultants, including but not limited to architects, designers, engineers, and other advisers, must preference solutions that maximise the use of local materials, finishes, products, goods, and services in construction, including fittings, fixtures, and equipment, and modern methods of construction (such as prefabricated, modular and/or offsite manufactured components) wherever possible.



The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.

Provision of Preventative and Reactive Mechanical & Electrical Services

Provision of Preventative and Reactive Mechanical & Electrical Services

Minimum Local Content:

  • 82% for the project

Local Jobs First Additional Requirements:

All consultants, including but not limited to architects, designers,
engineers, and other advisers, must preference solutions that
maximise the use of local materials, finishes, products, goods, and
services in construction, including fittings, fixtures, and equipment, and
modern methods of construction (such as prefabricated, modular
and/or offsite manufactured components) wherever possible



This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.

Hard Surface Reinstatement 2026

Hard Surface Reinstatement 2026

Minimum Local Content:

  • 97% for the project

Local Jobs First Additional Requirements:

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.
  • Local content set: April 2026
  • Delivery Agency: Yarra Valley Water
  • Project Type: Utilities
  • Region: Metropolitan Area

Wulerrp Secondary College (Pre-construction)

Wulerrp Secondary College (Pre-construction)

Minimum Local Content:

  • 97% for design and associated pre-construction services

Local Jobs First Additional Requirements:

All consultants, including but not limited to architects, designers, engineers, and other advisers, must preference solutions that maximise the use of local materials, finishes, products, goods, and services in construction, including fittings, fixtures, and equipment, and modern methods of construction (such as prefabricated, modular and/or offsite manufactured components) wherever possible.



The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.
  • Local content set: April 2026
  • Delivery Agency: VicRoads
  • Project Type: Building construction
  • Region: Metropolitan Area

Outsource Program - Operational and Maintenance Services Project

Outsource Program - Operational and Maintenance Services Project

Minimum Local Content:

  • 87% minimum local content for the Project

Local Jobs First Additional Requirements:

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.
  • Local content set: April 2026
  • Delivery Agency: Coliban Water
  • Project Type: Utilities
  • Region: Statewide

Sunshine Superhub - Regional line works

Sunshine Superhub - Regional line works

Minimum Local Content:

  • 93% minimum local content for the project

Steel Requirement:

90% minimum local content for steel supplied using locally milled and locally fabricated-processed steel

Local Jobs First Additional Requirements:

All consultants, including but not limited to architects, designers, engineers, and other advisers, must preference solutions that maximise the use of local materials, finishes, products, goods, and services in construction, including fittings, fixtures, and equipment, and modern methods of construction (such as prefabricated, modular and/or offsite manufactured components) wherever possible.



The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.
  • Local content set: March 2026
  • Delivery Agency: Rail Projects Victoria
  • Project Type: Rail infrastructure
  • Region: Metropolitan Area

Sunshine Superhub Project Enabling Works

Sunshine Superhub Project Enabling Works

Minimum Local Content:

  • 91% minimum local content for enabling works

Local Jobs First Additional Requirements:

All consultants, including but not limited to architects, designers, engineers, and other advisers, must preference solutions that maximise the use of local materials, finishes, products, goods, and services in construction, including fittings, fixtures, and equipment, and modern methods of construction (such as prefabricated, modular and/or offsite manufactured components) wherever possible



This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.
  • Local content set: February 2026
  • Delivery Agency: Rail Projects Victoria
  • Project Type: Rail infrastructure
  • Region: Metropolitan Area

Craigieburn Rd East to Bald Hill NDW Transfer Main Stage 1

Craigieburn Rd East to Bald Hill NDW Transfer Main Stage 1

Minimum Local Content:

  • 92% minimum local content for the project

Local Jobs First Additional Requirements:

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.
  • Local content set: December 2025
  • Delivery Agency: Yarra Valley Water
  • Project Type: Utilities
  • Region: Metropolitan Area

Disability Inclusion Facilitator Service (DIFS)

Disability Inclusion Facilitator Service (DIFS)

Minimum Local Content:

  • 97% for the project

Local Jobs First Additional Requirements:

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.

Modular Classrooms Program (MCP) Supplier Panel

Modular Classrooms Program (MCP) Supplier Panel

Minimum Local Content:

  • 92% minimum local content for construction
  • 82% minimum local content for Furniture, Fixtures and Equipment (FF&E)

Steel Requirement:

90% minimum local content for steel supplied using locally milled and locally fabricated processed steel.

Local Jobs First Additional Requirements:

  • Participants are required to proactively work with the State's Representative to identify opportunities to invest in productivity-enhancing technology and/or capital equipment for the Project to the satisfaction of the State's Representative. This may, for example, include the identification of investments that could support the procurement, manufacture and delivery of Modular Classrooms as well as build future business productivity, transferable capability (such as housing), and cost reductions.
  • All consultants, including but not limited to architects, designers, engineers, and other advisers, must preference solutions that maximise the use of local materials, finishes, products, goods, and services in construction, including fittings, fixtures, and equipment wherever possible.


The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.

Mt Fraser Water Supply Project

Mt Fraser Water Supply Project

Minimum Local Content:

  • 92% minimum local content for the project

Steel Requirement:

90% minimum local content for steel supplied using locally milled and locally fabricated-processed steel.

Local Jobs First Additional Requirements:

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.
  • Local content set: December 2025
  • Delivery Agency: Yarra Valley Water
  • Project Type: Utilities
  • Region: Metropolitan Area

Kindergartens on School Sites (2028)

Kindergartens on School Sites (2028)

Minimum Local Content:

  • 97% for consulting services
  • 92% for the project
  • 80% for furniture, fittings and equipment (FF&E)

Steel Requirement:

90% for steel supplied using locally milled and locally fabricated / processed steel

Local Jobs First Additional Requirements:

All consultants, including but not limited to architects, designers, engineers, and other advisers, must preference solutions that maximise the use of local materials, finishes, products, goods, and services in construction, including fittings, fixtures, and equipment, and modern methods of construction (such as prefabricated, modular and/or offsite manufactured components) wherever possible



The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.

M4 Water Main Renewal

M4 Water Main Renewal

Minimum Local Content:

  • 69% for Package 1 (Pipelining)
  • 89% for Package 2 (New MSCL pipe)

Local Jobs First Additional Requirements:

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.
  • Local content set: December 2025
  • Delivery Agency: Yarra Valley Water
  • Project Type: Utilities
  • Region: Metropolitan Area
Close

STRATEGIC PROJECTS - LOCAL JOBS FIRST