Strategic Project Listing

Showing 359 of 359

Maintenance Delivery Modernisation Program

Maintenance Delivery Modernisation Program

Minimum Local Content:

  • 86%

Local Jobs First Additional Requirements:

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.
  • Local content set: May 2024
  • Delivery Agency: Homes Victoria
  • Project Type: Other
  • Region: Statewide

Bulleen Park Sporting Facilities

Bulleen Park Sporting Facilities

Minimum Local Content:

  • 94% for the Project

Steel Requirement:

95% minimum local content for steel supplied locally using milled and locally fabricate-processed steel

Local Jobs First Additional Requirements:

All consultants, including but not limited to architects, designers, engineers, and other advisers, must preference solutions that maximise the use of local materials, finishes, products, goods, and services in construction, including fittings, fixtures, and equipment, and modern methods of construction (such as prefabricated, modular and/or offsite manufactured components) wherever possible.



The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.
  • Local content set: June 2024
  • Delivery Agency: Development Victoria
  • Project Type: Building construction
  • Region: Metropolitan Area

Program F - M80 Princes Freeway to Western Freeway Project

Program F - M80 Princes Freeway to Western Freeway Project

Minimum Local Content:

  • 93% for the Project
  • All consultants, including but not limited to architects, designers, engineers, and other advisers, must preference solutions that maximise the use of local materials, finishes, products, goods, and services in construction, including fittings, fixtures, and equipment, and modern methods of construction (such as prefabricated, modular and/or offsite manufactured components) wherever possible.

Steel Requirement:

95% minimum local content for steel supplied locally using milled and locally fabricated-processed steel

Local Jobs First Additional Requirements:

The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.

Program E - Barwon Heads Road Duplication Stage 2

Program E - Barwon Heads Road Duplication Stage 2

Minimum Local Content:

  • 95% for the Project
  • All consultants, including but not limited to architects, designers, engineers, and other advisers, must preference solutions that maximise the use of local materials, finishes, products, goods, and services in construction, including fittings, fixtures, and equipment, and modern methods of construction (such as prefabricated, modular and/or offsite manufactured components) wherever possible.

Steel Requirement:

95% minimum local content for steel supplied locally using milled and locally fabricated-processed steel

Local Jobs First Additional Requirements:

The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.

VicGrid - Energy Infrastructure Project

VicGrid - Energy Infrastructure Project

Minimum Local Content:

  • 97% for the Project
  • All consultants, including but not limited to architects, designers, engineers, and other advisers, must preference solutions that maximise the use of local materials, finishes, products, goods, and services in construction, including fittings, fixtures, and equipment, and modern methods of construction (such as prefabricated, modular and/or offsite manufactured components) wherever possible.

Local Jobs First Additional Requirements:

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.

Technical Advisory Services 2024

Technical Advisory Services 2024

Minimum Local Content:

  • 97% for the Project
  • All consultants, including but not limited to architects, designers, engineers, and other advisers, must preference solutions that maximise the use of local materials, finishes, products, goods, and services in construction, including fittings, fixtures, and equipment, and modern methods of construction (such as prefabricated, modular and/or offsite manufactured components) wherever possible.

Local Jobs First Additional Requirements:

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.

Membership Scheme Service Provision

Membership Scheme Service Provision

Minimum Local Content:

  • 90% for call centre services, excluding CRM information technology services
  • 50% for mail house services

Local Jobs First Additional Requirements:

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.
  • Local content set: April 2024
  • Delivery Agency: Ambulance Victoria
  • Project Type: Services
  • Region: Statewide

GH23013 Pathology Services Project

GH23013 Pathology Services Project

Minimum Local Content:

  • 97% for Pathology Services
  • 77% for Furniture, Fittings, and Equipment (FF&E)
  • 30% for Specialist Equipment and ICT Hardware

Local Jobs First Additional Requirements:

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.
  • Local content set: April 2024
  • Delivery Agency: Grampians Health
  • Project Type: Services
  • Region: Grampians

Leneva Primary School

Leneva Primary School

Minimum Local Content:

  • 92% for the Project
  • 83% for Furniture, Fittings and Equipment (FF&E)

Steel Requirement:

95% minimum local content for steel supplied locally using milled and locally fabricate-processed steel

Local Jobs First Additional Requirements:

All consultants, including but not limited to architects, designers, engineers, and other advisers, must preference solutions that maximise the use of local materials, finishes, products, goods, and services in construction, including fittings, fixtures, and equipment, and modern methods of construction (such as prefabricated, modular and/or offsite manufactured components) wherever possible.



The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.

Water Sewer & Water Network Upgrades

Water Sewer & Water Network Upgrades

Minimum Local Content:

  • 88% for the Project
  • All consultants including but not limited to architects, designers, engineers, and other advisers must preference solutions that maximise the use of local materials, finishes, products, goods, and services in construction including fittings, fixtures and equipment wherever possible.

Local Jobs First Additional Requirements:

The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.
  • Local content set: March 2024
  • Delivery Agency: Coliban Water
  • Project Type: Utilities
  • Region: Loddon Mallee

2026 Early Learning Centres

2026 Early Learning Centres

Minimum Local Content:

  • 97% minimum local content for pre-construction services
  • 92% for the Project
  • 83% for furniture, fittings, and equipment (FF&E).

Steel Requirement:

95%

Local Jobs First Additional Requirements:

All consultants including but not limited to architects, designers, engineers, and other advisers must preference solutions that maximise the use of local materials, finishes, products, goods, and services in construction including fittings, fixtures and equipment wherever possible



The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.

CBD Sewer Augmentation Stage 4 - Siddeley Street Project

CBD Sewer Augmentation Stage 4 - Siddeley Street Project

Minimum Local Content:

  • 95%

Local Jobs First Additional Requirements:

The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.
  • Local content set: March 2024
  • Delivery Agency: Greater Western Water
  • Project Type: Utilities
  • Region: Metropolitan Area

Central Bendigo Mine Rehabilitation Project - Groundwater

Central Bendigo Mine Rehabilitation Project - Groundwater

Minimum Local Content:

  • 85 per cent for the Project
  • 90 per cent for operations and maintenance
  • 97 per cent for superintendent

Local Jobs First Additional Requirements:

All consultants including but not limited to architects, designers, engineers, and other advisers must preference solutions that maximise the use of local materials, finishes, products, goods, and services in construction including fittings, fixtures and equipment wherever possible.



The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.

Toll Capability Project

Toll Capability Project

Minimum Local Content:

  • 32 per cent for the Roadside Systems Package (excl. RSS equipment/hardware)

Steel Requirement:

95 per cent minimum local content for steel supplied using locally milled and locally fabricated-processed steel

Local Jobs First Additional Requirements:

All consultants including but not limited to architects, designers, engineers, and other advisers must preference solutions that maximise the use of local materials, finishes, products, goods, and services in construction including fittings, fixtures, and equipment wherever possible



This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.

Bendigo Water Reclamation Plant Solids Handling Upgrade

Bendigo Water Reclamation Plant Solids Handling Upgrade

Minimum Local Content:

  • 73% minimum local content for the Project

Local Jobs First Additional Requirements:

All consultants including but not limited to architects, planners, designers, engineers, and other advisors must preference solutions that maximise the use of local materials, finishes, products, goods, and services in construction including fittings, fixtures and equipment wherever possible.



The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.
  • Local content set: February 2024
  • Delivery Agency: Coliban Water
  • Project Type: Utilities
  • Region: Loddon Mallee

Monash Health-Casey Hospital (MHCH) Multideck Carpark Project

Monash Health-Casey Hospital (MHCH) Multideck Carpark Project

Minimum Local Content:

  • 97 per cent for consultancy services
  • 94 per cent for construction

Steel Requirement:

95 per cent minimum local content for steel supplied using locally milled and locally fabricated-processed steel.

Local Jobs First Additional Requirements:

All consultants including but not limited to architects, designers, engineers, and other advisers must preference solutions that maximise the use of local materials, finishes, products, goods, and services in construction including fittings, fixtures and equipment wherever possible.



The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.
  • Local content set: February 2024
  • Delivery Agency: Monash Health
  • Project Type: Building construction
  • Region: Metropolitan Area

Royal Melbourne Hospital Materials Building Demolition

Royal Melbourne Hospital Materials Building Demolition

Minimum Local Content:

  • 97% for consultancy services
  • 91% for early works

Local Jobs First Additional Requirements:

All consultants including but not limited to architects, designers, engineers, and other advisers must preference solutions that maximise the use of local materials, finishes, products, goods, and services in construction including fittings, fixtures and equipment wherever possible.



The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.

Towers Redevelopment Tranche 1

Towers Redevelopment Tranche 1

Minimum Local Content:

  • 97% for consulting services
  • 98% for early works

Local Jobs First Additional Requirements:

All consultants including but not limited to architects, designers, engineers, and other advisers must preference solutions that maximise the use of local materials, finishes, products, goods, and services in construction including fittings, fixtures, and equipment wherever possible.



The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.
  • Local content set: December 2023
  • Delivery Agency: Homes Victoria
  • Project Type: Building construction
  • Region: Metropolitan Area
Close

STRATEGIC PROJECTS - LOCAL JOBS FIRST