Strategic Project Listing

Showing 384 of 384

Maintenance Services - Civil & Mechanical and Electrical

Maintenance Services - Civil & Mechanical and Electrical

Minimum Local Content:

  • 82% for the project

Local Jobs First Additional Requirements:

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.
  • Local content set: June 2025
  • Delivery Agency: Yarra Valley Water
  • Project Type: Utilities
  • Region: Metropolitan Area

Design and Construction Melton RWP Mechanical Upgrades

Design and Construction Melton RWP Mechanical Upgrades

Minimum Local Content:

  • 71% for the project

Steel Requirement:

Maximise the local content for steel supplied using locally milled and locally fabricated/processed steel

Local Jobs First Additional Requirements:

All consultants, including but not limited to architects, designers, engineers, and other advisers, must preference solutions that maximise the use of local materials, finishes, products, goods, and services in construction, including fittings, fixtures, and equipment, and modern methods of construction (such as prefabricated, modular and/or offsite manufactured components) wherever possible



The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.
  • Local content set: June 2025
  • Delivery Agency: Greater Western Water
  • Project Type: Utilities
  • Region: Metropolitan Area

Aurora Recycled Water Facility

Aurora Recycled Water Facility

Minimum Local Content:

  • 81% for the project

Steel Requirement:

Maximise the local content for steel supplied using locally milled and locally fabricated / processed steel

Local Jobs First Additional Requirements:

All consultants, including but not limited to architects, designers, engineers, and other advisers, must preference solutions that maximise the use of local materials, finishes, products, goods, and services in construction, including fittings, fixtures, and equipment, and modern methods of construction (such as prefabricated, modular and/or offsite manufactured components) wherever possible



The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.
  • Local content set: June 2025
  • Delivery Agency: Yarra Valley Water
  • Project Type: Utilities
  • Region: Metropolitan Area

Kindergartens on School Sites (2026)

Kindergartens on School Sites (2026)

Minimum Local Content:

  • 97% for pre-construction services
  • 92% for construction
  • 82% for furniture, fittings and equipment (FF&E)

Steel Requirement:

Maximise the local content for steel supplied using locally milled and locally fabricated/processed steel

Local Jobs First Additional Requirements:

All consultants, including but not limited to architects, designers, engineers, and other advisers, must preference solutions that maximise the use of local materials, finishes, products, goods, and services in construction, including fittings, fixtures, and equipment, and modern methods of construction (such as prefabricated, modular and/or offsite manufactured components) wherever possible

Outline the project design team's approach to prioritising the use of locally sourced materials, finishes, products, and services including modern methods of construction (such as prefabricated, modular and/or offsite manufactured components) wherever possible. The successful bidder must engage with ICN Victoria (Industry Adviser) during both the Design Development Stage and Construction Documents stage. Documented evidence must be submitted demonstrating their approach during the monitoring and reporting phase.



The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.

Program B - Watson Street Interchange Upgrade

Program B - Watson Street Interchange Upgrade

Minimum Local Content:

  • 96% minimum local content for the Project

Steel Requirement:

Maximise the local content for steel supplied using locally milled and locally fabricated-processed steel

Local Jobs First Additional Requirements:

All consultants, including but not limited to architects, designers, engineers, and other advisers, must preference solutions that maximise the use of local materials, finishes, products, goods, and services in construction, including fittings, fixtures, and equipment, and modern methods of construction (such as prefabricated, modular and/or offsite manufactured components) wherever possible.



The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.

Security Services

Security Services

Minimum Local Content:

  • 97

Local Jobs First Additional Requirements:

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.
  • Local content set: June 2025
  • Delivery Agency: Homes Victoria
  • Project Type: Services
  • Region: Statewide

Body Worn Cameras

Body Worn Cameras

Minimum Local Content:

  • 22% for the project

Local Jobs First Additional Requirements:

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.
  • Local content set: June 2025
  • Delivery Agency: Victoria Police
  • Project Type: Services
  • Region: Statewide

MR5 Tram

MR5 Tram

Minimum Local Content:

  • 83% for the operation and maintenance

Local Jobs First Additional Requirements:

Proponents are required to submit a Supply Chain Development Plan (SCDP) as an attachment to the Local Industry Development Plan. The SCDP must provide details of initiatives and activities to increase the competitiveness of Victorian businesses delivering parts for vehicle and infrastructure maintenance and assist them to participate in other projects. The SCDP must, at a minimum, include the following:

  • Details of the Proponent's commitment to implement the above initiatives and activities
  • Proposed timelines for implementation
  • A description of how the Proponent’s SCDP benefits local manufacturing and supply chain companies.

The successful proponent must report annually through the ICN VMC against the SCDP by providing at a minimum:

  • A list of relevant suppliers that could participate in the Project in the future
  • Annual expenditure for parts
  • A list of parts considered most likely for localisation in the future.


The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.

The Avenue, Coburg

The Avenue, Coburg

Minimum Local Content:

  • 97% for consulting services
  • 95% for early works

Local Jobs First Additional Requirements:

All consultants, including but not limited to architects, designers,
engineers, and other advisers, must preference solutions that
maximise the use of local materials, finishes, products, goods, and
services in construction, including fittings, fixtures, and
equipment, and modern methods of construction (such as
prefabricated, modular and/or offsite manufactured components)
wherever possible



The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.
  • Local content set: April 2025
  • Delivery Agency: Development Victoria
  • Project Type: Building construction
  • Region: Metropolitan Area

Maffra Residential Aged Care Development

Maffra Residential Aged Care Development

Minimum Local Content:

  • 90% for construction
  • 80% for furniture, fittings and equipment (FF&E)
  • 30% for specialist equipment
  • 97% for consultancy services

Steel Requirement:

Maximise local content for steel supplied using locally milled and locally fabricated / processed steel

Local Jobs First Additional Requirements:

All consultants including but not limited to architects, designers,
engineers and other advisors must preference solutions that
maximise the use of local materials, finishes, products, goods and
services in construction including fittings, fixtures and equipment
wherever possible.

The respondent must consult with the Australian MedTech
Manufacturing Centre to identify opportunities for local
businesses to supply the hospital.

Work with the ICN to create a dedicated Local MedTech industry
Sourcing Plan.



The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.

Program A – Yan Yean Road Stage 2 Upgrade

Program A – Yan Yean Road Stage 2 Upgrade

Minimum Local Content:

  • 94% for construction

Steel Requirement:

Maximise the local content for steel supplied using locally milled and locally fabricated/processed steel

Local Jobs First Additional Requirements:

All consultants, including but not limited to architects, designers, engineers, and other advisers, must preference solutions that maximise the use of local materials, finishes, products, goods, and services in construction, including fittings, fixtures, and equipment, and modern methods of construction (such as prefabricated, modular and/or offsite manufactured components) wherever possible



The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.

Kindergartens on School Sites (2027)

Kindergartens on School Sites (2027)

Minimum Local Content:

  • 92% for construction
  • 80% for furniture, fittings and equipment (FF&E)
  • 97% for pre-construction services

Steel Requirement:

90% minimum local content for steel supplied using locally milled and locally fabricated-processed steel

Local Jobs First Additional Requirements:

All consultants, including but not limited to architects, designers, engineers, and other advisers, must preference solutions that maximise the use of local materials, finishes, products, goods, and services in construction, including fittings, fixtures, and equipment, and modern methods of construction (such as prefabricated, modular and/or offsite manufactured components) wherever possible.



The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.

Victorian TAFE Student Management System (SMS)

Victorian TAFE Student Management System (SMS)

Minimum Local Content:

  • 97% for the Project

Local Jobs First Additional Requirements:

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.

Early Learning Childcare Centres (ELCCs) 2027

Early Learning Childcare Centres (ELCCs) 2027

Minimum Local Content:

  • 97% for pre-construction services
  • 92% for construction
  • 82% for furniture, fittings and equipment (FF&E)

Steel Requirement:

90% minimum local content for steel supplied using locally milled and locally fabricated-processed steel

Local Jobs First Additional Requirements:

All consultants, including but not limited to architects, designers, engineers, and other advisers, must preference solutions that maximise the use of local materials, finishes, products, goods, and services in construction, including fittings, fixtures, and equipment, and modern methods of construction (such as prefabricated, modular and/or offsite manufactured components) wherever possible.



The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.

Fines and Enforcement Services - Business Processing and Contact Centre Service

Fines and Enforcement Services - Business Processing and Contact Centre Service

Minimum Local Content:

  • 94% for professional services and enabling works

Local Jobs First Additional Requirements:

All consultants, including but not limited to architects, designers, engineers, and other advisers, must preference solutions that maximise the use of local materials, finishes, products, goods, and services in construction, including fittings, fixtures, and equipment, and modern methods of construction (such as prefabricated, modular and/or offsite manufactured components) wherever possible.



This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.

Ballarat Station Upgrade

Ballarat Station Upgrade

Minimum Local Content:

  • 92% for the Project

Steel Requirement:

Maximise the local content for steel supplied using locally milled and locally fabricated-processed steel

Local Jobs First Additional Requirements:

All consultants, including but not limited to architects, designers, engineers, and other advisers, must preference solutions that maximise the use of local materials, finishes, products, goods, and services in construction, including fittings, fixtures, and equipment, and modern methods of construction (such as prefabricated, modular and/or offsite manufactured components) wherever possible.



The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.

New Tarneit West Station

New Tarneit West Station

Minimum Local Content:

  • 92% for the Project

Steel Requirement:

90% minimum local content for steel supplied using locally milled and locally fabricated-processed steel

Local Jobs First Additional Requirements:

All consultants, including but not limited to architects, designers, engineers, and other advisers, must preference solutions that maximise the use of local materials, finishes, products, goods, and services in construction, including fittings, fixtures, and equipment, and modern methods of construction (such as prefabricated, modular and/or offsite manufactured components) wherever possible.



The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.

Regional Housing - Flora Hill, Bendigo Project

Regional Housing - Flora Hill, Bendigo Project

Minimum Local Content:

  • 97% for early works

Local Jobs First Additional Requirements:

All consultants, including but not limited to architects, designers, engineers, and other advisers, must preference solutions that maximise the use of local materials, finishes, products, goods, and services in construction, including fittings, fixtures, and equipment, and modern methods of construction (such as prefabricated, modular and/or offsite manufactured components) wherever possible.



The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.
  • Local content set: December 2024
  • Delivery Agency: Development Victoria
  • Project Type: Building construction
  • Region: Loddon Mallee
Close

STRATEGIC PROJECTS - LOCAL JOBS FIRST