Strategic Project Listing

Showing 334 of 334

Warrnambool Base Hospital Redevelopment Main Works Building Contractor

Warrnambool Base Hospital Redevelopment Main Works Building Contractor

Minimum Local Content:

  • 90% for construction works
  • 97% for consulting services
  • 40% for specialist equipment
  • 76% for main works fittings, fixtures and equipment (FF&E)
  • 70% for Regional Logistics Distribution Centre FF&E

Local Jobs First Additional Requirements:

All consultants including but not limited to architects, designers, engineers and other advisors must preference solutions that maximise the use of local materials, finishes, products, goods and services in construction including FF&E wherever possible.

The Project team (including architects, designers, engineers, and other specialists) must engage with the ICN’s industry advisor at both the 25% and 80% design development stages to ensure the use of local materials, finishes, products, goods and services including FF&E is maximised wherever possible.

The respondent must consult with the Australian MedTech Manufacturing Centre to identify opportunities for local businesses to supply the hospital / medical industry.



The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.

Youth Prevention and Recovery Care Program

Youth Prevention and Recovery Care Program

Minimum Local Content:

  • 97% for the consultancy services
  • 90% for the refurbishment of three facilities
  • 82% for the furniture, fixtures, and equipment (FFE)
  • 92% for the construction of five new facilities
  • 82% for the furniture, fixtures, and equipment

Local Jobs First Additional Requirements:

All consultants including but not limited to architects, designers, engineers and other advisers must preference solutions that maximise the use of local materials, finishes, products, goods and services in construction including fittings, fixtures and equipment wherever possible.

Victorian Building Health Authority must advise the Department of Jobs, Precincts and Regions, and the Industry Capability Network of any proposed significant diversion from the local content of any items listed in the successful supplier’s approved Local Industry Development Plan.



The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.

New Schools 2023

New Schools 2023

Minimum Local Content:

  • 91% Construction
  • 75% Furniture, fixtures and equipment

Local Jobs First Additional Requirements:

All consultants including, but not limited to, architects, designers, engineers and other advisers must preference solutions that maximise the use of local materials, finishes, products, goods and services in construction including fittings, fixtures and equipment wherever possible


The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.

Fitzroy Gasworks - Affordable Build to Rent 

Fitzroy Gasworks - Affordable Build to Rent 

Minimum Local Content:

  • 91% Construction
  • 98% Consulting Services
  • 74% for furniture,fixtures and equipment

Steel Requirement:

Maximise the use of local steel products made from locally milled steel.

Local Jobs First Additional Requirements:

All consultants including but not limited to architects, designers, engineers and other advisers must preference solutions that maximise the use of local materials, finishes, products, goods and services in construction including fittings, fixtures and equipment wherever possible.

The Project design team (including architects, designers, engineers and other specialists, etc.) must engage with the ICN (industry advisor) at both the 25 per cent and 80 per cent design development stages to ensure the use of local materials, finishes, products, goods and services including fittings, fixtures and equipment is maximised wherever possible.

Development Victoria must advise the Department of Jobs, Precincts and Regions and the Industry Capability Network of any proposed significant diversion from the local content of a steel package or any item listed in the successful supplier’s approved Local Industry Development Plan.



The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.
  • Local content set: August 2021
  • Delivery Agency: Development Victoria
  • Project Type: Building construction
  • Region: Metropolitan Area

Enhancing Infrastructure Maintenance Delivery

Enhancing Infrastructure Maintenance Delivery

Minimum Local Content:

  • 82%

Local Jobs First Additional Requirements:

All consultants including but not limited to designers, engineers and other advisers must preference solutions that maximise the use of local materials, finishes, products, goods and services in construction including fittings, fixtures and equipment wherever possible.


The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.
  • Local content set: August 2021
  • Delivery Agency: Melbourne Water
  • Project Type: Utilities
  • Region: Metropolitan Area

Western Port Highway Upgrade

Western Port Highway Upgrade

Minimum Local Content:

  • 97%

Local Jobs First Additional Requirements:

All consultants including but not limited to architects, designers, engineers and other advisers must preference solutions that maximise the use of local materials, finishes, products, goods and services in construction including fittings, fixtures and equipment wherever possible.


The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.
  • Local content set: August 2021
  • Delivery Agency: Major Road Projects Victoria
  • Project Type: Building construction
  • Region: Metropolitan Area

Fishermans Bend Innovation Precinct

Fishermans Bend Innovation Precinct

Minimum Local Content:

  • 90% minimum local content for construction
  • 95% pre-construction services
  • 94% civil works and parks

Steel Requirement:

95% minimum local content for steel supplied using locally milled and locally fabricated-processed steel

Local Jobs First Additional Requirements:

All consultants, including but not limited to architects, designers, engineers and other advisers must preference solutions that maximise the use of local materials, finishes, products, goods and services in construction including fittings, fixtures and equipment wherever possible.



The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.
  • Local content set: November 2023
  • Delivery Agency: Development Victoria
  • Project Type: Building construction
  • Region: Metropolitan Area

Victorian Renewable Energy Target Auction 2 (VRET2)

Victorian Renewable Energy Target Auction 2 (VRET2)

Minimum Local Content:

  • 67% local content for Solar Projects
  • 65% local content for Wind Projects with towers up to and including diameters of 4.5 metres
  • 61% local content for Wind Projects with towers greater than 4.5 metres in diameter

Local Jobs First Additional Requirements:

Solar Projects:

  • 90% minimum local content for operations and maintenance phase of the projects
  • 95% minimum local content for steel products and components using locally milled steel.

Wind Projects with towers up to and including diameters of 4.5 metres:

  • 90% minimum local content for operations and maintenance phase of the projects
  • 95% minimum local content for steel products and components using locally milled steel.

Wind Projects with towers greater than 4.5 metres in diameter:

  • 90% minimum local content for operations and maintenance phase of the project
  • maximise the use of local steel products using locally milled steel.


The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.

Water and Sewerage Program 2022

Water and Sewerage Program 2022

Minimum Local Content:

  • 92% local content

Local Jobs First Additional Requirements:

All consultants including but not limited to architects, designers, engineers and other advisers must preference solutions that maximise the use of local materials, finishes, products, goods and services in construction including fittings, fixtures and equipment wherever possible.



The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.
  • Local content set: July 2021
  • Delivery Agency: Melbourne Water
  • Project Type: Utilities
  • Region: Metropolitan Area

Waste Management Services

Waste Management Services

Minimum Local Content:

  • 96% local content

Local Jobs First Additional Requirements:

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.
  • Local content set: July 2021
  • Delivery Agency: HealthShare Victoria
  • Project Type: Services
  • Region: Statewide

Water and Sewer Maintenance Services

Water and Sewer Maintenance Services

Minimum Local Content:

  • 95% local content

Local Jobs First Additional Requirements:

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.
  • Local content set: July 2021
  • Delivery Agency: South East Water
  • Project Type: Services
  • Region: Metropolitan Area

Kingston Residential Aged Care

Kingston Residential Aged Care

Minimum Local Content:

  • 97% for Preconstruction consulting services

Local Jobs First Additional Requirements:

All consultants including but not limited to architects, designers, engineers and other advisers must preference solutions that maximise the use of local materials, finishes, products, goods and services in construction including fittings, fixtures and equipment wherever possible.



The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.

Fixed-wing Air Ambulance Services

Fixed-wing Air Ambulance Services

Minimum Local Content:

  • 80%

Local Jobs First Additional Requirements:

All consultants including but not limited to architects, designers, engineers and other advisors must preference solutions that maximise the use of local materials, wherever possible.



This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.
  • Local content set: March 2021
  • Delivery Agency: Ambulance Victoria
  • Project Type: Services
  • Region: Statewide

Financial Audit Services Panel

Financial Audit Services Panel

Minimum Local Content:

  • 97%

Local Jobs First Additional Requirements:

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.

Next Generation Trams

Next Generation Trams

Minimum Local Content:

  • 60% for the manufacture of trams

Local Jobs First Additional Requirements:

Participants are required to proactively work with the State's Representative to identify research and development opportunities for the local supply chain and research institutions to the satisfaction of the State's Representative. This will include timeframes for such opportunities during and beyond the Project. This may, for example, include the development of a Research and Development Plan

Participants are required to proactively work with the State's Representative to identify innovation opportunities for the Project to the satisfaction of the State's Representative. This may, for example, include the identification of technologies that could be implemented during the procurement, manufacture and delivery of Next Generation Trams including time frames

Participants will be eligible for the additional Local Jobs First research and development bonus of 35 per cent of the value of approved research and development investment in collaboration with Victorian Universities and businesses where they exceed the minimum local content requirement committed in the Local Industry Development Plan (LIDP)

Participants are required to proactively work with the State's Representative to identify both export opportunities for local suppliers and foreign direct investment opportunities into Victoria to the satisfaction of the State's Representative

Participants will be eligible for the additional Local Jobs First export bonus of 40 per cent of the value of approved exports where they exceed the minimum local content requirement committed to in the LIDP. Exports are deemed to be international exports out of Victoria that generate employment and capability outcomes.



This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.
  • Local content set: March 2021
  • Delivery Agency: Department of Transport
  • Project Type: Manufacturing and services
  • Region: Metropolitan Area

North East Link Project Provision of Strategic Technical Advisory Services

North East Link Project Provision of Strategic Technical Advisory Services

Minimum Local Content:

  • 96% for consulting services

Local Jobs First Additional Requirements:

All consultants including but not limited to architects, designers, engineers and other advisers must preference solutions that maximise the use of local materials, finishes, products, goods and services in construction including fittings, fixtures and equipment wherever possible



This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.
  • Local content set: March 2021
  • Delivery Agency: North East Link Project
  • Project Type: Services
  • Region: Metropolitan Area

Chisholm Frankston Redevelopment - Stage 2

Chisholm Frankston Redevelopment - Stage 2

Minimum Local Content:

  • 97% for consulting services
  • 98% for early works
  • 92% for construction
  • 86% for fittings, fixtures and equipment

Local Jobs First Additional Requirements:

All consultants including but not limited to architects, designers, engineers and other advisors must preference solutions that maximise the use of local materials, finishes, products, goods and services in construction including fittings, fixtures and equipment wherever possible



The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.
  • Local content set: March 2021
  • Delivery Agency: Chisholm Institute
  • Project Type: Building construction
  • Region: Metropolitan Area

Wyndham Law Courts

Wyndham Law Courts

Minimum Local Content:

  • 90 per cent for construction
  • 97 per cent for pre-construction services
  • 85 per cent for furniture, fixtures and equipment

Local Jobs First Additional Requirements:

All consultants including but not limited to architects, designers, engineers and other advisors must preference solutions that maximise the use of local materials, fittings, finishes, products, goods and services in construction including fixtures and equipment wherever possible.

Court Services Victoria must advise the Department of Jobs, Precincts and Regions (DJPR) and the Industry Capability Network of any proposed significant diversion from the local content of a steel package or item listed in the successful supplier’s approved Local Industry Development Plan.



The Major Projects Skills Guarantee applies to this project.

This project is subject to the Local Jobs First Commissioner's advocacy, monitoring, and compliance powers.
  • Local content set: March 2021
  • Delivery Agency: Court Services Victoria
  • Project Type: Building construction
  • Region: Metropolitan Area
Close

STRATEGIC PROJECTS - LOCAL JOBS FIRST